My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to Agreement for Engineering Services for US 20 Water Main Extension to South Bend Chocolate Company Site – A & Z Engineering, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to Agreement for Engineering Services for US 20 Water Main Extension to South Bend Chocolate Company Site – A & Z Engineering, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:39:21 AM
Creation date
2/12/2020 9:37:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated 12/21, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 2 <br />1. Background Data. - <br />a. Effective Date of Owner -Engineer Agreement: December 21„ 2017 <br />b. Owner: City of South Bend <br />Engineer: A&Z En aincerin', LLC <br />d. Project: Airport Annexation Area Surve <br />2. Description of Modifications: <br />EXHIBIT A — Engineer's Services <br />PART 2 — ADDITIONAL SERVICES <br />A2.01 Additonal Services Requiring Owner's Written Authorization <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others <br />Additional Services of the type listed below. <br />27. Watermain alignment cost study, layout and design along US 20 Bus. <br />(Lincoln Hwy) Corridor west of US 31/US 20 Interchange to Pine Road in <br />City of South Bend, IN. See Exhibit No. 1 <br />EXHIBIT B — Owner's Responsibilities <br />S. Complete agency fee and bond waiver forms and pay associated permit fees,. <br />EXHIBIT C <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) - <br />Lump Sum Method of Payment <br />A. Owner shall pay Engineer... Representative, if any, as follows: <br />-a�wwmM- Page 1 <br />(Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.