My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2020 Signal Knock-Down and Wiring Investigation Proj No. 119-110 - Pemberton Davis Electric, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - 2020 Signal Knock-Down and Wiring Investigation Proj No. 119-110 - Pemberton Davis Electric, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:44:19 PM
Creation date
12/23/2019 11:17:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
XXII. TRAFFIC SIGNAL HEAD, 3 SECTION, INSTALL <br />A. Prevailing Specifications: 2020, INDOT Standard Specification Section 805 <br />B. Additions <br />1. Work for this item shall include the installation and assembly of new traffic signal head. Materials <br />will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby Deal of <br />City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The <br />City will not be responsible for delivery of materials to the project site. <br />2. The item TRAFFIC SIGNAL HEAD, 3 SECTION, INSTALL shall be measured by each properly <br />installed. <br />3. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br />TRAFFIC SIGNAL HEAD, 3 SECTION, INSTALL .................. EA <br />XXIII. TRAFFIC SIGNAL HEAD, 5 SECTION, INSTALL <br />A. Prevailing Specifications: 2020, INDOT Standard Specification Section 805 <br />B. Additions <br />1. Work for this item shall include the installation and assembly of new traffic signal head. Materials <br />will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby Deal of <br />City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the materials. The <br />City will not be responsible for delivery of materials to the project site. <br />2. The item TRAFFIC SIGNAL HEAD, 5 SECTION, INSTALL shall be measured by each properly <br />installed. <br />3. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br />TRAFFIC SIGNAL HEAD, 5 SECTION, INSTALL ...„....„„..„„„... EA <br />XXIV. PEDESTRIAN PUSH BUTTON ASSEMBLY, APS, INSTALL <br />A. Prevailing Specifications: 2020, INDOT Standard Specification Section 805 <br />B. Additions <br />1. Work for this item shall include the installation and assembly of new pedestrian push button <br />assembly. Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall <br />contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick <br />up of the materials. The City will not be responsible for delivery of materials to the project site. <br />2. Pedestrian push button assemblies shall be in accordance with MUTCD and ADA guidelines. <br />3. The item PEDESTRIAN PUSH BUTTON ASSEMBLY, APS, INSTALL shall be measured by <br />each properly installed. <br />4. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br />PEDESTRIAN PUSH BUTTON ASSEMBLY, APS, INSTALL ................... EA <br />XXV. PEDESTRIAN SIGNAL HEAD, INSTALL <br />A. Prevailing Specifications: 2020, INDOT Standard Specification Section 805 <br />B. Additions <br />1. Work for this item shall include the installation and assembly of new pedestrian signal heads. <br />Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby <br />Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the <br />materials. The City will not be responsible for delivery of materials to the project site. <br />2. Pedestrian push button assemblies shall be in accordance with MUTCD and ADA guidelines. <br />3. The item PEDESTRIAN SIGNAL HEAD, INSTALL shall be measured by each properly installed. <br />4. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br />PEDESTRIAN SIGNAL HEAD, INSTALL ..„....„.„,„...... EA <br />Version 4/2/2019 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.