Laserfiche WebLink
XVIII. TS-2 CONTROLLER P-1 FOUNDATION <br />A. Prevailing Specifications: 2020, INDOT Standard Specification Section 805 <br />B. Additions <br />1. A Type P-1 foundation shall be provided for a TS-2 Controller Cabinet in accordance with INDOT <br />Standard Drawings, see attached sheet. <br />2. The Contractor shall call for utility locates prior to the installation of the foundation. <br />3. Placement of the foundation shall be field verified by the Engineer prior to installation. <br />4. Cabinet foundation, wiring, and all connections necessary are included in this pay item. <br />5. The item TS-2 CONTROLLER P1 FOUNDATION shall be measured by each properly installed. <br />6. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br />TS-2 CONTROLLER P-1 FOUNDATION...„...,.„„...„... EA <br />XIX. TS-2 CONTROLLER CABINET, INSTALL <br />A. Prevailing Specifications: 2020, INDOT Standard Specification Section 805 <br />B. Additions <br />1. This work shall consist of installing the TS-2 Controller Cabinet to the poured foundation. <br />2. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to <br />coordinate pick up of the materials. The City will not be responsible for delivery of materials to the <br />project site. <br />3. The item INSTALL TS-2 CONTROLLER CABINET shall be measured by each properly installed. <br />4. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br />TS-2 CONTROLLER CABINET, INSTALL .................. EA <br />XX. SIGNAL CANTILIEVER, FOUNDATION <br />A. Prevailing Specifications: 2020, INDOT Standard Specification Section 805 <br />B. Additions <br />1. Signal Cantilever Foundation shall be installed in accordance with 2010 INDOT Standard <br />Drawing E805-SGMA, see attached sheet. <br />2. The contractor shall call for utility locates prior to the installation of the foundation. <br />3. Placement of the foundation shall be field verified by the engineer prior to installation. <br />4. The item SIGNAL CANTILIEVER, FOUNDATION shall be measured by each properly installed. <br />5. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br />SIGNAL CANTILIEVER, FOUNDATION ..... „...... .„..„. EA <br />XXI. SIGNAL CANTILEVER STRUCTURE, SINGLE ARM, INSTALL <br />A. Prevailing Specifications: 2020, INDOT Standard Specification Section 805 <br />B. Additions <br />1. This work shall consist of installing signal poles and mast arms to the poured foundations and <br />anchor bolts. <br />2. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to <br />coordinate pick up of the materials. The City will not be responsible for delivery of materials to the <br />project site. <br />3. The cost of all necessary anchor bolts, hardware, labor, etc. necessary for installation of the <br />cantilever structure shall be included in the cost of this item. <br />4. The cost of foundation, new signal heads, and wiring shall be paid for separately. <br />5. The item SIGNAL CANTILEVER STRUCTURE, SINGLE ARM, INSTALL shall be measured by <br />each properly installed. <br />6. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br />SIGNAL CANTILEVER STRUCTURE, SINGLE ARM, INSTALL .................. EA <br />Version 4/2/2019 Page - 7 Public Works Quote <br />