Laserfiche WebLink
U AN AID -AI I A g <br />CONTRACT OVER.SIGH I... <br />BS, Civil Engineering, Purdue University, 1996 <br />Professional Engineer: IN <br />Susan's 32 years of consulting and public <br />sector experience includes administration, <br />project development, project management, <br />design, survey, and construction inspection for <br />a vast array of roadway and bridge projects. Susan has also been <br />directly involved with the development, design, and construction <br />of over $100 million of local federal -aid projects. <br />REPRESENTATIVE MANAGEMENT EXPERIENCE <br />» Cleveland Road Reconstruction - St. Joseph County <br />Construction Cost: $8.3 million (2019) <br />» CR 400S, Phase 1 & 2 - Cass County <br />Construction Cost: $1.8 million (Phase 1- 2017) & $2.7 million <br />(Phase 2 - 2018) <br />» Olive Street & Sample Street - St. Joseph County & <br />City of South Bend Construction Cost: $8.7 million (2017) <br />» Gumwood Road Reconstruction, Phase 1 & 2 - St. Joseph <br />County Construction Cost: $7.4 million (2016) <br />TRACY WCORMICK, PE <br />CONSTRUCTION INSPECTOR ME <br />BS, Civil Engineering, Purdue University, 1993 <br />Professional Engineer: IN I INDOT Certified <br />SiteManager I INDOT Certified Technician <br />Tracy is a skilled engineer with 25 years of <br />experience in the planning, design, and <br />construction observation of engineering <br />projects. She is co-founder of McCormick Engineering, a local <br />WBE and DBE firm. Tracy has successfully worked with our team <br />on numerous inspection projects. <br />IREIPRESENTATIIVIf::: IIN SIPEC"rIoN EXPERIENCE <br />» IKeircheir Road from the Railroad to Dierdorff Road <br />City of Goshen Construction Cost: $4.7 million (2019) <br />» Olive Street & Sample .Street St. Joseph County & <br />City of South Bernd Construction Cost: $8.7 million (2017) <br />» Gurnwood (Road Reconstruction, Phase 1 & 2. <br />St.. Joseph County Construction Cost: $7.4 million (2016) <br />» Edison Road City of South Bend <br />Construction Cost: $375,000 <br />» 1.69th Street (Reconstruction City of Hammond <br />Construction Cost: $6.6 million <br />IRYAN CLAIRK, IPE <br />Tf.',"CHNICAL ADVISOR <br />BS, Civil Engineering, Purdue University, 1996 <br />Professional Engineer: IN <br />Ryan has over 20 years of transportation <br />I� <br />design, traffic, safety, and project <br />�t management experience. He offers a strong <br />technical knowledge with a public sector <br />perspective. Prior to joining the private sector, Ryan spent over 10 <br />years with St. Joseph County Highway Department and served as <br />Chief Design Engineer for three years. <br />REPRESENTATIVE DESIGN EXPERIENCE <br />» Cleveland Road Reconstruction - St. Joseph County <br />Construction Cost: $8.3 million (2019) <br />» Edison Road & Ironwood Drive Corridor Rehabilitation - <br />City of South Bend Construction Cost: $1.4 million (2017) <br />» Lincoln ay West Road Redesign - City of South Bend <br />Construction Cost: $1.4 million (2015) <br />» Western Avenue Road Redesign - City of South Bend <br />Construction Cost: $950,000 (2015) <br />» CR 300S - Cass County Construction Cost: $1.6 million (2011) <br />sco r r IF BOOKOVER <br />CONS 'RUCTION INSPECTOR <br />IlNll')OT Cerdfierl Sd`te[Vi ar aF.,,,eir i VN1: 01 &.otofied <br />Lr::dhi[ouclxn <br />Scott serves as a Construction Inspector for <br />northern Indiana projects. He has worked on <br />a variety of road projects where he has <br />gained knowledge of road and concrete <br />construction practices and inspection. <br />REPRESENTATIVE INSPECTION EXPERIENCE <br />» Cleveland Road Reconstruction - St. Joseph County <br />Construction Cost: $8.3 million (2019) <br />» Kercher Road Reconstruction, Phase I & II - City of Goshen <br />Construction Cost: $4.7 million (2019) & $4.1 million (2020) <br />» CR 4005, Phase 2 - Cass County <br />Construction Cost: $2.7 million (2018) <br />» Olive Street & Sample Street - St. Joseph County & <br />City of South Bend Construction Cost: $8.7 million (2017) <br />» Two -Way Street Conversion - City of South Bend <br />Construction Cost: $20 million (2016) <br />