Laserfiche WebLink
17. All the unloading and distribution of all pipe and materials used in the <br />performance of work as set forth above. <br />18. All the service connections of pipe from main sewers or water lines to the <br />building line. <br />19. The laying of pipe and making of all connections and/or joints on any and all <br />types of pipe for water, sewer and/or any other uses, including laser alignment. <br />20. The cutting of streets and right-of-ways for laying of pipes, cables and/or <br />conduits for all purposes; digging of trenches and manholes, etc.; handling and conveying <br />of all materials; concreting, back -filling, grading and resurfacing and all other labor <br />connected therewith; clearing and site preparation as defined herein; cutting or <br />jackhammering of streets, roads, sidewalks or aprons by hand or the use of air or other <br />tools; digging of trenches, ditches and manholes and the leveling, grading and other <br />preparation prior to laying pipe or conduit for any purpose; loading, unloading, sorting, <br />stockpiling, wrapping, coating, treating, handling and distribution of water mains and all <br />pipe, including the placing, setting and removal of skids, cribbing, driving of sheet piling, <br />lagging and shoring of all ditches, trenches and manholes, handling, mixing or pouring of <br />concrete and the handling and placing of other materials for saddles, beds or foundations <br />for the protection of pipes, wires, conduits, etc.; back -filling and compacting of all ditches, <br />resurfacing of roads, streets, etc., and/or restoration of lawns and landscaping; unloading, <br />handling, distribution, the assembly in place, bolting and lining up of sectional metal or <br />other pipe including corrugated pipe; laying of lateral sewer pipe from main sewer to <br />building; laying, leveling and making of the joint of all multi -cell conduit or multi -purpose <br />pipe; cutting of holes in walls, footings, piers and/or other obstructions for the passage of <br />pipe or conduit for any purpose and the pouring of concrete to secure said holes; digging <br />under streets, roadways, aprons or other paved surfaces for the passage of pipe, by hand, <br />earth auger or any other method and manual and hydraulic jacking of pipe under said <br />surfaces; installation of septic tanks, cesspools and drain fields; all work in connection <br />with shafts, tunnels, subways and sewers; construction of sewers, shafts, tunnels, subways <br />and caissons. <br />21. The setting of all man -holes such as pre -cast poured in place block, brick, <br />setting of all cast iron catch basins and manholes and all work in connection thereto. <br />22. In compressed air, all work underground or in compression chambers, <br />including tending of the outer aid lock; all work in compressed air construction, including <br />but not limited to, groutmen, trackmen, blasters, shield drivers, miners, brakemen, miners' <br />helpers, lock tenders, mulching machine operators, motor men, gauge tenders, rodmen, <br />compressed air electricians, setting of liner plate and ring sets, drill runners, powdermen <br />0 <br />