Laserfiche WebLink
Selge Construction South Bend GESC 2019 <br />horizontalearthborings, site design, excavation, grading <br />.. ....................._..se pr...� �..n w......ww..........., <br />gn, in d subbase preparation, concrete street paving, <br />formed and slip formed curb. Bob takes care of the estimating, planning and coordination of projects at <br />Selge. <br />Justin Butler — Director of Operations <br />For this project, Justin will provide executive oversight and will assist with project estimating and <br />scheduling. <br />Justin is a graduate of Indiana Wesleyan University and has been employed at Selge since 2010. His <br />experience includes Lift stations, dewatering, pipe installation, storm and sanitary sewers, estimating, <br />planning and coordination of projects. <br />Peter Rienks —Director of Business Development <br />Overall at Selge, Peter is responsible for driving strategy, building culture, and growing Selge Construction <br />in a responsible way. He assists with key relationships, special projects, service expansion, and developing <br />new business. <br />Peter holds two degrees, a Bachelors of the Science of Architecture (Lawrence Tech University) and a <br />Masters of Business Administration (University of Notre Dame). Peter's work background is in project <br />development, engineering, and procurement. He has specialized in utility scale solar energy development <br />and was responsible for building and developing some of the largest projects in the Midwest. <br />For this project, Selge would be responsible for the overall project management and general construction. We <br />would closely manage and coordinate with any/all subcontractors. Considering the nature of the project, we <br />anticipate using the resources of at least three subcontractors: <br />Midland Engineering (roofing) <br />JPR Engineering (electrical/structural engineering) <br />Bender Electric (electrical installation) <br />Besides these three subcontractors, it is our intent to self -perform all other tasks, including, the actual labor to <br />install the solar racking system and the panels. <br />20 <br />