My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Johnson Melloh Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Johnson Melloh Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:20:50 PM
Creation date
8/28/2019 11:11:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Our commissioning approach/methodology is designed to achieve the following specific <br />objectives: <br />• Ensure that applicable equipment and systems are installed properly and receive <br />complete operational checkout by the subcontractors <br />Maintain compliance with all installation requirements <br />Verify and document proper performance of equipment and systems <br />Provide complete O&M documentation to the customer <br />Ensure that the customer's operating personnel are properly trained <br />Representatives from the City of South Bend and Johnson Melloh Solutions will conduct a <br />final inspection to verify compliance to the contract documents. Johnson Melloh Solutions <br />will prepare and submit closeout records and as -built documents to the respective <br />representatives. Commissioning all features of the new or upgraded equipment will be <br />conducted using the manufacturer's specifications, as well as the performance criteria <br />established for the specific project. Once commissioning is completed, Johnson Melloh <br />Solutions will seek the City of South Bend's final acceptance. <br />Training <br />The key to the success of this project lies in implementing an effective training and <br />development program, specifically customized for your facility and staff. Ensuring that <br />the people who will help maintain the upgraded facilities and who understand how their <br />roles impact energy savings are integral in attaining project goals and energy savings <br />targets. Training, in conjunction with our service offering, is designed to protect our clients' <br />investment while maximizing the efficiency of their operations. <br />It is critical that training occurs at defined intervals throughout the course of the project, <br />facilitating proper communication between the Johnson Melloh Solutions team and the <br />client's staff regarding how buildings will operate throughout the installation period and <br />the entire term of our agreement. Refresher seminars will be available from year-to-year, <br />as requested, in order to maintain the degree of training necessary for staff to perform at a <br />high level of efficiency. Each training session will review the basic practices and introduce <br />new technology and procedures as they become available. <br />As part of our performance contracting services, Johnson Melloh Solutions will provide <br />training to operating personnel on the proper operation of the equipment, which is crucial <br />for maintaining reliability and long-term integrity of the systems. Furthermore, in order <br />to achieve the utility and operational savings targets set for the project, everyone should <br />clearly understand his or her role in reaching those targets. Instruction, conducted during <br />the final phase of project commissioning, is provided by the manufacturer on -site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.