My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Commerce Center Architectural Precast Concrete Panels Project No 119-030R - Coreslab Structures
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Commerce Center Architectural Precast Concrete Panels Project No 119-030R - Coreslab Structures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:06:42 AM
Creation date
8/15/2019 8:52:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� tl <br />IDTask Name ij Duration <br />V <br />2 <br />Bid Drwgs come out <br />1 day <br />3 <br />Date of Bid <br />1 day <br />T <br />4 <br />Date of PC Award (LOI) <br />1 day <br />V <br />5 <br />ER' <br />Date of PC Award (Contract) <br />1 day <br />l <br />6 <br />7 <br />�,,, <br />CORESLAB ENGINEERING <br />1 day <br />8 <br />Precast Erection Drawings <br />50 days <br />9 <br />Approval Period <br />20 days <br />Th' <br />10 <br />p <br />Final Erection Drawings <br />25 days <br />Th! <br />11 <br />Shop Tickets <br />60 days <br />Moi <br />14 <br />f-,34 <br />SAMPLES/ SUBMITTALS <br />1 day <br />T <br />15 <br />c <br />Submit Concrete & Brick Samples <br />10 days <br />I' <br />16 <br />Approve Concrete & Brick Samples <br />10 days <br />I <br />17 <br />� ` <br />Make Mock-up <br />15 days <br />P <br />18 <br />® <br />Approve Mock-up <br />15 days <br />1' <br />20 <br />21 <br />ER <br />PRODUCTION <br />22 <br />ER <br />Order Thin Brick, Lead Time (approx.) <br />23 <br />Order Form Liner Lead Time (approx.) <br />74 <br />c <br />Arch Precast Production (690 pcs) <br />25 <br />2fi.. <br />27 <br />Order CIP Level 2 embeds <br />28 <br />Deliver Level 2 embeds <br />29 <br />Deliver Level 3 embeds <br />30 <br />Deliver Level 4 embeds <br />31 <br />Deliver Level 5 embeds <br />32 <br />n <br />Deliver Level 6 embeds <br />33 <br />n <br />Deliver Level 7 embeds <br />34 <br />Deliver Level 8 embeds <br />35 <br />q" <br />Deliver Level 9 embeds <br />3& <br />® <br />Deliver Level 10 embeds <br />37� <br />nu <br />Erect Arch Precast (Floors 1-5) <br />38 <br />Erect Arch Precast (Floors 6-Roof) <br />Project: Coreslab- Commerce Center Task <br />Date: 8/13119 <br />By: Corey G Split <br />1 day Th <br />60 days F <br />50 days F <br />110 days fir, Arch PC Production (690 pcs) <br />15 days <br />2 days Tu <br />2 days 7 <br />2 days Th <br />2 days <br />2 days <br />2 days <br />2 days <br />2 days Ada. <br />2 days M 10 embeds <br />60 days I°— "' t Erect Arch PC Firs 1 5) <br />57 days Erect Arch PC (Firs. 6- Roof) <br />
The URL can be used to link to this page
Your browser does not support the video tag.