My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Commerce Center Architectural Precast Concrete Panels Project No 119-030R - Coreslab Structures
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Commerce Center Architectural Precast Concrete Panels Project No 119-030R - Coreslab Structures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:06:42 AM
Creation date
8/15/2019 8:52:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(INDIANAPOLIS, INC.) <br />1030 South Kitley Avenue <br />Indianapolis, IN 46203 <br />Construction Services (4592 40th St., SE, Kentwood, MI 49512) have provided sealant and <br />cleaning services for Coreslab projects as well. <br />Subcontractor list is yet to be determined but will be supplied to the Construction Manager within <br />48 hours of this bid per the documents. <br />4. The only on -site equipment required for our scope of work would be the tractor trailers delivering <br />precast to the jobsite, and man -lifts or scissor lifts that will be used to grout and patch the precast <br />concrete after it is erected. <br />If Alternate #5 is accepted, then an erection crane will be required for wall panel erection (it will <br />be provided by the subcontractor erector). <br />If Alternate #6 is accepted (precast to precast joint caulking) then a man -lift or scissor -lift will <br />also be on -site to perform this work. <br />The crane, semi -truck and man -lifts will need 30 feet of access around the building footprint area <br />to deliver and erect the precast. Tower crane and buck hoist are assumed to be provided by Others <br />(F.A. Wilhelm). <br />5. We have material contracts with our vendors of cement, pre -stressing strand, rebar, and weld <br />plates which allow us to accurately estimate the cost of our materials. In addition, we have <br />received proposals for the thin brick material, form liner, and insulation that is needed to <br />manufacture the precast panels for the architectural intent of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.