Laserfiche WebLink
Josh Ehmer <br />From: Joe Jonas <joej@hrpconstruction.com> <br />Sent: Tuesday, July 9, 2019 1:32 PM <br />To: Josh Ehmer <br />Cc: Toy Villa; Roger Nawrot <br />Subject: Miami Basin <br />Attachments: I MG_0176.j peg <br />Importance: High <br />Josh, <br />I hope you had a good 4th. I am wanting to know the status of the sediment information that I <br />presented last week. I would like to get that quantity on the pay application. <br />Additionally, I have attached the as -built for the Miami Basin 6 inch storm lines that were replaced on <br />the project. Both of the lines had to be replaced and relocated because their elevation were in conflict <br />with the new haul road. It is not HRP's fault that the design prints did not have the two lines shown at <br />time of bid. HRP had to adjust the locations of those 6 inch lines in order to build the project. My <br />initial price had some equipment time in there for sitting idle on the site. I removed that idle time and <br />that is how we have the price of $1,975.00. Please add this to the change order so we can get it <br />processed on my end. <br />Please advise, as we would like to get this project complete. <br />Joe Jonas <br />Utility Damage Prevention Specialist / Estimator <br />HRP Construction Inc. <br />(574) 271-7800 — Office <br />(574) 274-5716 - Mobile <br />(574) 271-0524 - Fax <br />www.!]Lrp n_rg fion coo- <br />HF�P <br />CONSTRUCTION i <br />