Laserfiche WebLink
BID/PROPOSALcy�er�SW <br />CITY OF SOUTH BEND <br />Project Name: 2019 Contractor Paving <br />�w <br />' yqy 7'M"9CY" <br />Project Number: 119-062 <br />For Bids Due: July 23, 2019, 9:30 a.m., Local Time " <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />Alternate No. 2 Rockne Drive from Ironwood Dr. to Bader <br />Item <br />No. <br />Description <br />1 <br />Maintenance of Traffic <br />2 <br />Mobilization and Demobilization <br />3 <br />Milling, Up to 1.5" <br />4 <br />HMA Surface, 9.5 mm - Type B <br />5 <br />Tack Coat <br />6 <br />Joint Adhesive, Surface <br />7 <br />Adjust Manhole to Grade <br />8 <br />Line, Thermoplastic, Solid, White, 4" <br />9 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />10 <br />Grooving for Pavement Markings, 4" <br />Quantity-rUnit <br />Unit Price <br />Item Total <br />3,000 04 <br />$ 3,000.04 <br />1 <br />$ 6,500.00 <br />.____. <br />$ 6,500.00 <br />1 <br />$ 2.21 <br />$ 21,392.80 <br />9,680 <br />SY <br />$ 96.00 <br />$ 76,800.00 <br />800 <br />TONS <br />_ <br />$ 1.00 <br />_ <br />.. $_ .......__... 4.00 <br />4 <br />TONS <br />$ 0.81 <br />$ 4,322.16 <br />5,336 <br />LF <br />................ <br />1------- <br />$ 450.001 <br />.. ........... -- ... <br />$ 4,500.00 <br />10 <br />EA <br />...................... <br />$ 0.641 <br />_ .........__._.......... <br />$ 2,643.20 <br />4,130 <br />LF <br />$ 0.64 <br />$ 2,560.00 <br />4,000 <br />LF <br />$ 0.26 <br />$ 2,113.80 <br />8,130 <br />F <br />Alternate <br />No. <br />2 Total <br />$123,836.0( <br />................................................................................ <br />Base Bid + Alternate No. 1 Total $598,632.00 <br />........................................... _ <br />Base Bid + Alternate No. 2 Total $585,105.00 ITmm mITITITITITITITITITITITITITITITITITITITITITITITITITITITITITITIT mITITITITmmmITmm W <br />................................ .... <br />Base Bid + All Alternates $72 ,,468.00 <br />"tie (°,'11, on°t:°act r:: L�:�st bfiii���] on both the Bilse Chl ii:11im�] <br />Version 4/2/2019 Contractor's Bid for Public Works - 9 <br />