Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2019 Contractor Paving <br />Project Number: 119-062 <br />For Bids Due: July 23, 2019, 9:30 a.m., Local Time <br />Contractor Name: Rieth-Riley Construction Co., Inc. mmmm <br />Alternate <br />No. 1 Voorde St. from Bendix Dr. to Sheridan St <br />Item <br />��...... <br />. <br />No. <br />Description <br />Quantit <br />Unit <br />Unit Price <br />Item Total <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 3,894.30 <br />$ 3,897.40 <br />...... ........_ <br />2 <br />. --- .-. ________................... <br />Mobilization and Demobilization <br />1 <br />LS <br />$ 6,500.00 <br />$ 6,500.00 <br />3 <br />....................... <br />Milling, Up to 1.5" <br />W..............._ <br />11,435 <br />SY <br />$ 1.69 <br />IT <br />.m.m$19 325.15WWW� <br />4 <br />HMA Surface, 9.5 mm -Type B <br />1,000 <br />TONS <br />m$ 86.00 <br />$ 86,000.00 <br />5 <br />Tack Coat <br />5 <br />TONS <br />$ 1.00 <br />$ 5.00 <br />6 <br />.............. ___ <br />Joint Adhesive, Surface <br />6,120 <br />LF <br />$ 0.50 <br />$ 3,060.00 <br />7 <br />......................a.a.a.a <br />Adjust Manhole to Grade <br />6 <br />EA <br />$ 450.00 <br />.. ..m......... <br />$ 2,697.66 <br />.................................. <br />8 <br />---- --.................... ._ <br />Adjust Inlet to Grade <br />2 <br />EA <br />$ 450.00 <br />$ 899.24 <br />9 <br />Traffic Detector Loop Replacement <br />8 <br />EA <br />$ 450.00 <br />$ 3,600.00 <br />10 <br />...... _.......... <br />" <br />SignalCable,2C 16 GA. Shielded <br />240 <br />LF <br />�.�..._._.................. <br />$ 2.00 <br />............................. <br />$ 480.00 <br />11 <br />2" Conduit <br />240 <br />LF <br />$ 12.00 <br />$ 2,880.00 <br />12 <br />............................................................................................... <br />Traffic Detector Housing <br />2 <br />EA <br />$ 450.00 <br />$ 900.00 <br />�. <br />13 <br />Pavement Message Markings, Thermoplastic, White, <br />............. <br />6 <br />_....... . <br />EA <br />$ 150.00 <br />$ 900.00 <br />..�. <br />Lane Indication Arrow <br />14 <br />Line, Thermoplastic, Solid, White, 4" <br />175 <br />LF <br />$ 1.19 <br />$ 208.25 <br />15 <br />Transverse Marking, Thermoplastic, Solid, White, <br />40 <br />LF _ <br />$ �m14.90 <br />...........� <br />$ 596.00 <br />24" <br />16mmm ITITITIT <br />mITITLine,ITThermoplastic, Solid, Yellow, 4" <br />790 <br />LF <br />$ 0.74 <br />$ 584.60 <br />17 <br />_.......... <br />Line, Thermoplastic, Broken, Yellow, 4" <br />...... .... .... ... <br />2,090 <br />-_ <br />LF <br />$ 0.74 <br />$ 1,546.60 <br />--._.............�......... <br />18 <br />Grooving for Pavement Markings, 4" <br />3,055 <br />................... <br />LF <br />.................. -. <br />$ 0.42 <br />$ 1,283.10 <br />Alternate <br />No. <br />1 Total <br />$137,363.00 <br />BIDDER: Rieth-Riley Construction Co. <br />Version 4/2/2019 Contractor's Bid for Public Works - 8 <br />