Laserfiche WebLink
M.E. Simpson Co., Inc. I Fire Hydrant Flo / aterrnain Capacity Testing roram Page 6 <br />SAFETYPROJECT <br />M.E. Simpson Co., Inc.'s Safety Programs cover all aspects of the work performed by M.E. Simpson Co., <br />Inc. We take great pride in our safety plan/policy/program and that is evident in our EMR scores over <br />the last five years. The safety of our employees, the utilities employees and that of the general public is <br />our #1 priority. <br />Our Safety Plan/Policy/Program, with all of its parts, is 60 pages in length. In an effort to be more <br />efficient and less wasteful we do not print copies of the safety program for RFPs. There is nothing <br />secretive or proprietary contained within our plan/policy/program and we are happy to share its <br />contents. If you would like a PDF copy of our plan/policy/program please contact Terrence Williams, <br />Operations Manager, at 800.255.1521 and a copy of our program will be sent via email to you. <br />Below is an overview of our plan/policy/program: <br />f,y is a major part of any project. M.E. Simpson Co., Inc. always provides a safe work <br />MPenvironment for its employees. Our staff is trained in General Industry OSHA rules, <br />Confined Space Entry & Self -Rescue, First Responder First Aid, CPR, and Traffic Control. <br />While in the field on your project, M.E. Simpson Co., Inc. and its employees will follow all of <br />the necessary safety procedures to protect themselves, your staff and the general public, <br />r r�r .. ats s mm f rr Te rm o o et r i'it ,A uran <br />I'he use of a "one -person" k4k detection tearn is dangerous and impractical where water mains run <br />under roadways.. It would Ibe a dangerous precedent to allow a "one -person" team to access main line <br />valves located in the roadway, RLLe,uiwr�� tub �� �a�c� to the ,y ly a ri�h ,liau iflh�onr��„pry" and at the same U:iirne <br />try to controll traffic flow at that person"s location in the street. <br />Therefore M.E. Simpson Co., Inc. adheres to the following: <br />The Project Manager and the Field Manager will be trained in accordance with OSHA Standard <br />910 (General Industry) and be in possession of an OSHA 10 Hour or 30 Hour Card. <br />Any listening points located in a "confined space" such as pit and vault installations that require <br />entry will be treated in accordance with the safety rules regarding Confined Space Entry, <br />designated by the Utility, The Department of Labor and OSHA. <br />o All personnel are trained and certified in Confined Space Entry & Self -Rescue. <br />We will follow all safety rules regarding First Responder First Aid & CPR, designated by the <br />Utility, The Department of Labor and OSHA. <br />o All personnel are trained and certified in First Responder First Aid & CPR. <br />We will follow all traffic safety rules, designated by the Utility, The Department of Labor, <br />OSHA, and the Illinois Department of Transportation (per MUTCD). <br />o All personnel are trained ,and certified by the AMERICAN TRAFFIC SAFETY SERVICES <br />ASSOCIATION (ATSSA) in Traffic Control and Safety. <br />Current docu�rnentation of �a.fet rdianfn and ce tifica00ill rarf„N�e pr���r ��d for all frupl��� rwsonu�el for <br />f � p'.!4itumllu y I here c i tufications are current t an r:l� tr�_u� m�L� (rcair_ r� uurf l <br />