My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Three Twenty at the Cascade Exterior Insulation and Finish System Project No 118-074B-R - Skyline Plastering Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Three Twenty at the Cascade Exterior Insulation and Finish System Project No 118-074B-R - Skyline Plastering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:12:21 PM
Creation date
3/12/2019 3:58:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
232 Westgate Drive <br />SNPiAsTimo Carol Stream, IL 60188 <br />630-627-1100 630-627-7711 Fax <br />Project Name: Three Twenty at the Cascade <br />Location: South Bend, IN <br />Submitted To: Panzica Building Corporation <br />Address: 41E E Monroe Street, Suite 320 <br />City, State, Zip: South Bend, IN 46601 <br />Date Of Plans: 2/14/19 (Rev S) <br />System: EIFS <br />Date: 3/7/19 <br />Attn: Jeffrey S. Novotny <br />Phone: 574.234.0124 <br />Cell: 574.532.6930 <br />Email: `snovotn Snzicai,n t. <br />In reference to the above project I would like to submit my quotation on EIFS. Skyline Plastering, INC. proposes to furnish <br />all materials, union labor, supplies, equipment, insurance, and supervision necessary to perform the EIFS work in accordance manufacturer's <br />specifications. Proposal EXCLUDES any flashing, weeps or soffit vents unless specified below. Proposal based on regular working hours, <br />no overtime or shift work. Excluded are permits and permit fees, engineering and engineering fees, shop drawings and as built drawings, <br />dumpsters and temporary barricades. Proposal is good for 9O days. <br />Exterior Insulation Finish S steal-StoTherm ci Essence or e ual <br />>Install EIFS system with 2" EPS insulation, basecoat, mesh, and standard textured finish. <br />>Standard textures include sand fine, medium, and swirl textures. <br />>Includes manufacturer's standard fluid -applied air/moisture barrier over substrate behind EIFS. <br />>Includes EIFS per EIFS texture finish schedule notes 1-4 per plans. <br />>Includes for sealant joint installation where EIFS meets EIFS or where EIFS meets dissimilar material. <br />>Figured work to be performed from swingstages, landing platform to be provided by others in advance. <br />>Sequencing and dimensions must be coordinated with window installer for alignment. <br />>Excludes caulk joint between metal cap and EIFS. <br />>Excludes EIFS application over unapproved by manufacturer substrates - see manufacturer's specifications. <br />>Excludes any walk -way scaffolding. <br />>Excludes any sidewalk permits, by others. <br />>Excludes any framing, sheathing, or painting - by others. <br />>Excludes any metal, coping, flashing, vents, or otherwise. <br />>Excludes any other areas of alterations. <br />>System design for a PB system. <br />>Allteinnate.ff),; Credit for direct applied plaster finish to be applied over densglass substrate by others. <br />>Alieicn .le #2:. Add for "wavy" pattern EIFS with sand fine finish to be field-appled at north elevation. <br />>AIlteii nak.l #3: Add for "wavy" pattern EIFS panels with sand fine finish to be appled at north elevation <br />$ 475,800.00 <br />(1,935.00) <br />82, 900.00 <br />85, 700.00 <br />Note: Includes 2018-2019 Union Labor Rate. <br />This proposal does not include any cost for providing temporary heat or enclosure. Additional cost and arrangements must be made by the owner <br />G General Contractor with SPI. Texture and color to be selected by architect, owner, or general contractor 14 days prior to start date. <br />Written confirmation is required. Any changes in construction documents involving EIFS scope of work or change orders must be approved by <br />SPI in writing. Progress payments are due 30 days from invoice. <br />All payments are to be sent via next day delivery. Responsible to pay reasonable attorney and collection fees if collection services are required. <br />' ire/rMAK <br />Skyline Plastering, INC., warrants that its work will be free from defects in workmanship for a period of ONE Year from date of completion. <br />Peter Klyachenko Jr. <br />pater i n�i L(L r mm gr <br />Skyline Plastering, Inc. <br />PLEASE SIGN AND RETURN VIA FAX TO 630-627-7711 <br />Signature / Title: <br />Date of Acceptance: <br />
The URL can be used to link to this page
Your browser does not support the video tag.