My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Three Twenty at the Cascade Exterior Insulation and Finish System Project No 118-074B-R - Skyline Plastering Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Three Twenty at the Cascade Exterior Insulation and Finish System Project No 118-074B-R - Skyline Plastering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:12:21 PM
Creation date
3/12/2019 3:58:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Peter Klyachenko Jr. <br />Skyline Plastering, Inc. <br />232 Westgate Drive <br />Carol Stream, IL 60188 <br />Department of Public Works <br />1316 County -City Building <br />South Bend, IN 46615 <br />RE: Plan & Equipment for Proposed EIFS Work <br />Skyline Plastering is proposing to install the EIFS scope of work at the Three Twenty at The Cascade. We <br />have separated a qualified project manager, field foreman, general superintendent, and sufficient <br />qualified journeymen laborers / plasterers to perform the work. An executive project manager is already <br />appointed to oversee and manage the team actively to insure safety, quality, and schedule standards are <br />met. <br />We have included a combination of swing stages, aerial and/or scissors lifts, and scaffolding to provide <br />sufficient manpower and the safest and most competitive means with which to install the EIFS work. <br />ITEM <br />DURATION <br />START DATE <br />END DATE <br />Contract Docs <br />10 Days <br />3/19/19 <br />3/29/19 <br />Submittals <br />10 Days <br />3/19/19 <br />3/29/19 <br />Pre -Construction <br />5 Days <br />4/1/19 <br />4/5/19 <br />Mobilization <br />5 Days <br />4/8/19 <br />4/12/19 <br />EIFS Installation <br />55 Days <br />4/15/19 <br />7/7/19 <br />Close -Out Docs <br />5 Days <br />7/10/19 <br />7/14/19 <br />All employees on site will be payroll staff of Skyline, no sub -contractors are planned for the work. <br />All aerial and scissors lifts are to be rented from either Kropp Equipment or Sunbelt as previously quoted, <br />All swing stages are to be rented from Prime Scaffold or Designed Equipment as previously quoted. <br />All Sto materials will be purchased either from FBM or L&W Building Supply as previously quoted. <br />All starter boards or custom foam panels are to be purchased with Stucco Moulding as previously quoted. <br />All scaffolding, tools, toolboxes, safety equipment, etc will be provided by Skyline Plastering. <br />If you have any additional questions regarding our recently completed projects, please feel free to contact <br />US. <br />Sincerely, <br />Peter Klyachenko <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.