Laserfiche WebLink
Item 1— Phase H Environmental Site Assessment <br />The Phase I Environmental Site Assessment (ESA) for the project was performed in 2016 and <br />updated in 2017 and was conducted as a preliminary assessment to identify the potential <br />presence of hazardous materials within the limits of the project. The findings of the Phase I ESA <br />identified multiple recognized environmental concerns (RECs) with potential to impact the <br />subsurface conditions. <br />Following the approval of the Phase I ESA findings by INDOT, it was determined that a Phase II <br />ESA is required to further evaluate the RECs identified in the Phase I ESA which may pose a <br />threat to worker safety or require waste handling. A conference call between UNITED, INDOT <br />and Civil & Environmental Consultants, Inc. (CEC) on November 1, 2017, concluded the <br />additional assessment was necessary to prepare a site -specific Phase II ESA work plan. The <br />need for a Phase II ESA is listed as a firm commitment in the environmental document and is <br />required to be completed prior to the project letting. <br />CEC's proposal has been enclosed for reference. <br />The following is a summary of the requested fee supplement for this item. <br />Description Supplemental Fee <br />A.2.e.6 Phase II Environmental Site Assessment ....................................... .... ............ $16,000 <br />