My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:35:09 AM
Creation date
12/12/2018 1:18:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(ITY OF SOUTH BEND <br />.. .. ..... ...... - --------- . . . . . . . . . . . ....................... <br />U. PRONG APPROAN <br />MAINTENANCE OF TRAFFIC <br />The most current plan set details two phases of construction. <br />Phase Uwill construct 19feet ofthe west half ofthe BendixDrive Roadway. The project will maintain one-way southbound <br />traffic byutilizing the existing northbound lane. Northbound traffic will utilize the posted cetournomte.VVevvou|dan�dpate <br />traffic control signnge and temporary pavement markings would be placed so that this sedjon can be utilized for through <br />traffic onthe next phase. <br />Phase UU will construct the 19 foot pavement cross-section of the east half of Bendix Drive. The project is to continue <br />maintaining one-way southbound traffic by utilizing the newly constructed west half of the roadway. Northbound traffic will <br />continue to use the posted detour route. VVeanticipate the multi -use path will be constructed during this phase, as well as <br />final signaUzationupgrades and final pavement markings and signage. <br />The contractor will need to maintain local access as necessary, and within the posted detour route throughout construction. <br />Bill Coleman will work closely with the contractor's Certified Traffic [ontro|SupervisortoensureaUvveek|ys|gnundbarricade <br />reports are submitted properly and on-timo. <br />Northbound traffic will be detoured until construction operations are substantially completed. Traffic will utilize US 31 <br />(Cleveland Road) to the north, St. Joseph Valley Parkway to the west, and US 20 (Lincoln Way West) to the south. <br />Letter of Interest to Provide Construction Inspection Services I Reconstruction of Bendix Drive ��l <br />
The URL can be used to link to this page
Your browser does not support the video tag.