My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - VPA Maintenance Storage Bldg Project No 118-046R - The Robert Henry Corp
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 3 - VPA Maintenance Storage Bldg Project No 118-046R - The Robert Henry Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:48:53 PM
Creation date
12/12/2018 12:51:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 i � /� ► ,� <br />General and Utility Contractors <br />Sent via email to Josh.Ehmer <br />November 15, 2018 <br />City of South Bend <br />Department of Public Works <br />227 West Jefferson Boulevard, Room 1316 <br />South Bend, IN 46601 <br />RE: VPA Maintenance Storage Building — Proposal for Replacement of Unsuitable Soils <br />Gentlemen, <br />The building foundation excavation started on November 131 and concrete rubble, broken brick and other <br />building demolition debris were discovered in the building area. Weaver Consultants Group was asked to <br />inspect and provide their findings. Under their direction, the extent of the debris and condition of the soils in <br />the building area were determined. The attached letter from Weaver Consultants summarizes the site <br />conditions and their recommendations. In accordance with these recommendations, we propose to replace <br />the unsuitable soils including the buried 6" concrete slab in the approximate south half of the building and <br />the two (2) south overhead door aprons with compacted aggregate fill material; and to change the foundation <br />forming system from "earth -formed" to "regular -formed" due to the sloughing of the sides of the excavations <br />during the compacting process of the new aggregate fill material in the south half of the building and the in - <br />place but loose soils in the north half of the building. The costs to perform this work are as follows: <br />Remove concrete rubble and other unsuitable materials: 337 CY @ $19.94/CY = .................. $ 6,720.00. <br />Furnish, place and compact suitable fill: 337 CY @ $29.34/CY =...................................... $ 9,888.00. <br />Break and remove buried 6" thick concrete slab under building: 187 SY @ $16.37/SY = .......... $ 3,061.00. <br />Furnish, place and compact suitable fill: 50 CY @ $29.34/CY =....................................... $ 1,467.00. <br />Labor for forming only of footings and grade beams: 2,040 SF @ $7.255/SF = ..................... $14,800.00. <br />Material for forming only footings and grade beams: 2,040 SF @ $1.471/SF = ..................... 3 000.00. <br />Total............................................................................................................ $38,936.00. <br />We appreciate this opportunity to serve you and look forward to hearing from you. Please don't hesitate to <br />contact us with any questions or comments. <br />Respectfully submitted, <br />THE ROBERT HENRY CORPORATION <br />w g e�r t <br />43bhn A. Callan, <br />Project Manager <br />/jac <br />cc: Brian D. Amor <br />404 South Frances Street - P.O. Box 1407 -South Bend, Indiana 46624 <br />www.roberthenrycorp.com - Tel. 574-232-2091 • Fax 574-232-3979 <br />
The URL can be used to link to this page
Your browser does not support the video tag.