,V,,,AIA Document G701Tm - 2011 7 <br />Change Order <br />PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br />Venues, Parks and Arts Maintenance Contract For: Owner and Contractor Change Order Number: 03 <br />Storage Building <br />1020 High Street Date: September 11, 2018 Date: November 27, 2018 <br />South Bend, IN 46601 <br />OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) <br />South Bend Board of Public Works Gregory A Kil & Associates, Inc. (d/b/a) Robert Henry Corporation <br />Kil Architecture/Planning <br />227 West Jefferson Blvd 1126 Lincolnway East 404 South Frances St. <br />South Bend, IN 46601 South Bend, IN 46601 South Bend, IN 46624 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, If applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />Due to unforseetl field conditions, remove concrete rubble„ broken brick and ocher building demolition debris that was discovered during the <br />building foundation excavation, On south half of building, replace with compacted aggregate fill material. On north side of building where <br />auncompacted fill was encountered, rccompact soils. Change the foundation forming system from "earth -formed" to "regular -formed" due to <br />the sloughing of the sides of the foundation excavations as per the attached The Robert Henry Corporation letter, the Weaver Consultants <br />Croup Soil Observations report, and Don Ritschard's email regarding VPA Unit Prices all dated November 15, 2018. <br />The original Contract Sum was $ 330 174.00 <br />The net change by previously authorized Change Orders $ 18 780.00 <br />The Contract Sum prior to this Change Order was 348 954.00 <br />The Contract Sum will be increased by this Change Order in the amount of 38 936.00 <br />The new Contract Sum including this Change Order will be 387,890.00 <br />The Contract Time will be unchanged by Zero (0) days. <br />The new date of Substantial Completion will be 3/25/19 <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE Gre o A Kil & Associates, Inc ARCHITECT, CONTRATOR AND OWNER. <br />Robert-W""l , r ,uorati n City of South Bend Venues Parks & Arts <br />ARCHITECT (Firm name) NT tl�l' ame) OWNER (Form name) <br />�.� <br />E IIATUR SIGNATURE J <br />Gregory A Kil NCARB, AIA rDC <br />r , <br />Architect a r <br />�" (I <br />PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAMO A <br />DATE DATE DATE <br />,)� .. <br />AIA Document G701 TM — 2017. Copyright ®1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. li f+N'P,NflJG: "'u14s <br />Nf,"' Doctment N pru terf." h! y LLS, Cq:u1pyd1111^A Law, and Vntawnadamall °I"ueafl s, 1,IIn :s3 owize w1 11::rodii.ii0u° n d1stdbuHon of thIs AM" DorumenDv <br />any poruon of Nfu mnn",I,r resuft do nirmnnrmlm r.N A'an rl nmNrr°NhIM µ erunllf es, and W N IPmn IICurimn :ao.uf .l tothe irnmuimlmum extent IIlmrnnnNitrdmr under the dnw. This <br />document was produced by AIA software at 12:38:12 ET on 11 /27/2018 under Order No. 2157555661 which expires on 11127t2019, and is not for regale. <br />User Notes: (31919ADA53) <br />