My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Lochmueller Group - Additions for LWE Corridor Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 2 to PSA - Lochmueller Group - Additions for LWE Corridor Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:22:58 AM
Creation date
12/12/2018 12:41:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of pages, referred to in <br />and part of the Agreement between Owner and Engineer for <br />Professional Services dated February 13, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 2 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: February 13, 2018 <br />b. Owner : Cil of South Fend Indiana Board of Public Works <br />c. Engineer: Lochmueller iron In . <br />d. Project: Lincoln Way I ast ('orridor Improvements I 1 2-0' <br />2. Description of Modifications: <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance with <br />the Agreement and previous amendments, if any, is modified as follows: <br />a. Refer to Exhibit A, Part 1 and add the following: <br />A 1.04 Project Design <br />D. Utility Coordination <br />The Engineer shall provide Utility Coordination Services for the project to include the <br />following: <br />a. Initial Utility Research <br />b. Sending Initial Notice of Proposed Improvement to each affected utility. <br />c. Requesting Verification of Existing Facilities from each affected utility. <br />E. Railroad Coordination <br />1. The Engineer shall provide Railroad Coordination Services for the project to include the <br />following: <br />a. Initial coordination and identification of permitting requirements <br />b. Coordination of plan review by the railroad <br />c. Develop special provisions for railroad coordination <br />Page 1 <br />(Exhibit K — Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.