My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - US Army Corps of Engineers - Flood Induation Mapper for SB
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Agreement - US Army Corps of Engineers - Flood Induation Mapper for SB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:19:01 AM
Creation date
12/12/2018 12:40:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 4. RIVER CROSS SECTION SURVEY <br />The USGS will use an Acoustic Doppler Current Profiler (ADCP) to collect the <br />bathymetry of the river cross sections. The City of South Bend will provide the as -built <br />drawings with elevations for the bridges in the study area. If as -built drawings are not <br />available then the bridge or bridges will be surveyed by the City of South Bend. There <br />are 24 bridges within the study area. There is also the East Race Whitewater Rafting <br />Canal that as -built drawings will need to be provided by the City of South Bend. It is <br />estimated that the ADCP survey will be $20,000 and the bridge surveys will be $10,000. <br />The estimated cost/value of the Task 4 work is $30,000.00. <br />TASK 5. WATER LEVEL STAGE GAGE INSTALL <br />The USGS will install a new water level stage gage at the WWTP. The USGS will <br />develop the rating curve at the gage to relate stage and discharge. The rating curve is <br />what will be used for the steady state hydraulic model. This will be used to set and <br />calibrate the flood stages used in the FIM. <br />The estimated cost/value of the Task 5 work is $18,000.00. <br />TASK 6. GAGE OPERATIONS — 2 YEARS <br />The USGS will operate the new gage for two years in order to develop a sufficient rating <br />curve that can be used in modeling. The gage costs $14,000 per year to operate and <br />maintain. The City of South Bend will have to pay the USGS to continue to operate and <br />maintain the gage after the initial two year period, that is, if the City chooses to continue <br />to operate the gage after the initially required first two years. <br />The estimated cost/value of the Task 6 work is $28,000.00. <br />TASK 7. HYDROLOGIC ANALYSIS <br />The USACE will provide a hydrologic analysis for the study. This cost estimate assumes <br />that the gage that is measured on the Saint Joseph River near South Bend, where there is <br />a NOAA Advanced Hydrologic Prediction (AHP) gage, becomes a continuous automated <br />USGS gage. A hydrologic analysis of the nearby gages with a long period of record will <br />be used to get some flood frequency statistics, but the rating curve that will be developed <br />by the USGS using data collected for the first year after the gage is installed is what will <br />be used for the steady state hydraulic model. Multiple flow rates to simulate approximate <br />bank full stage to the highest rated stage (most likely at 1 ft intervals) will be determined <br />and coordinated with USGS and the City of South Bend. <br />The estimated cost/value of the Task 7 work is $4,000.00, <br />.n <br />