My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - US Army Corps of Engineers - Flood Induation Mapper for SB
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Agreement - US Army Corps of Engineers - Flood Induation Mapper for SB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:19:01 AM
Creation date
12/12/2018 12:40:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 1. PROJECT MANAGEMENT AND ADMINISTRATION <br />USACE will provide the overall management of the project including: coordinating and <br />attending monthly calls, upward reporting on project status, and preparing and <br />monitoring project schedules and finances. The USACE Project Manager will be the <br />primary point -of -contact and lead for the project. <br />Monthly calls are proposed during the project period and will include small -group <br />management meetings. The purpose of the small -group management meetings is to <br />direct and coordinate the USACE work efforts toward successful and timely <br />completion. The attendees should include appropriate project representatives from <br />USACE, USGS, and the City. One in -person kickoff meeting will be held in South <br />Bend, to be scheduled at the appropriate time. A 50% progress review meeting will take <br />place via WebEx/conference call. One in -person meeting will take place in South Bend <br />for a 90% report review with USACE, USGS, and the City. Two final meetings will be <br />scheduled with USACE, USGS, and the City to explain the South Bend Flood <br />Inundation system to the City officials and then the public. The final meetings will be <br />scheduled for the same day at a South Bend City office. <br />The estimated cost/value of the Task 1 work is $20,000.00. <br />TASK 2. PROGRAM MANAGEMENT <br />USACE will manage all funding and scheduling for the study. USACE will coordinate, <br />obtain, and load all Federal funding from USACE Headquarters. USACE will work with <br />the sponsor to obtain the required 50% cost match for the study and load the funds onto <br />the project management system. USACE will transfer funds to the USGS for their <br />associated tasks. <br />The estimated cost/value of the Task 2 work is $6,000.00. <br />TASK 3. H&H BACKGROUND DATA COLLECTION AND PROCESSING <br />USACE will collect previous hydrologic and hydraulic information from any relevant <br />past projects located in the project area, gather and process any/all existing Geographic <br />Information Systems (GIS) data required for the analyses and mapping ((LiDAR, DEM, <br />channel geometry, structures, etc), and process new survey data required and collected <br />for the project under Task 4. The USACE will use existing data, when applicable, to <br />expedite the modeling process and reduce project costs. The digital elevation model <br />(DEM) developed under this task will be used as the base for the hydraulic model <br />developed under Task 8. <br />The estimated cost/value of the Task 3 work is $17,000.00, <br />A-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.