My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Design Services for Washington and LaPorte St Intersection
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Design Services for Washington and LaPorte St Intersection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:21:27 AM
Creation date
11/28/2018 10:51:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
areas lying outside of a subdivision. Lot lines will be depicted per the <br />recorded subdivision plats or GIS information. <br />B. Design Phase (Lump Sum) <br />1. Prepare Design Phase Documents for the Project, including: <br />a. Develop Design and Plans for the Washington Avenue Improvement <br />Project which, includes the following (See Appendix 1 of Exhibit A: <br />1) Two 12 foot wide travel lanes, one lane in each direction, with an 8 <br />foot parking lane along both sides of Washington Street, where <br />feasible. <br />2) Along Chapin Street/Dr. Martin Luther King Drive, the lane <br />configuration will remain two travel lanes, one in each direction, <br />with an exclusive left turn lane. <br />3) All sidewalk will be replaced within the project limits, except the <br />sidewalk along the south side of Washington Street, west of Chapin <br />Street. <br />4) All curb ramps will be replaced within the project limits.. <br />5) Cross walks will be squared off to cross the roadway to as close a 90 <br />degree angle, as feasible. <br />6) Bump -outs shall be included at the intersections and alleys. <br />7) Parking will be maintained along Washington Street where feasible. <br />8) Re -align the north approach of LaPorte Avenue at the intersection <br />with Washington Street. <br />9) The right turn lane for westbound traffic on Washington Avenue <br />turning onto LaPorte Avenue will be removed to re-establish a tree - <br />lawn along the north side of Washington Street between LaPorte <br />Avenue and Chapin Street/Dr. Martin Luther King Drive. <br />10) The two drives to the Kizer House in the northwest quadrant of the <br />intersection of Washington Street and Chapin Street/Dr. Martin <br />Luther King Drive will be eliminated and parking will be added. <br />11) The roadways will be milled and resurfaced within the project limits. <br />12) All work shall be performed within the existing right of way, <br />Exhibit A — Page 2 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Co vri ht 0 2008 National Society of Professional Engineer, for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.