Laserfiche WebLink
November2, 2018 <br />Complete an existing conditions plan based on aerial photography, provided site plans, and field <br />verification. <br />• Project Kick-off Meeting (1) <br />• Site Visit, Inventory, and Analysis <br />• Schematic Design Plan Options and Associated Graphic (rendered perspectives and plans) <br />• City Review Meeting (1) <br />• Review plans with City Venues, Parks, and Arts, Century Center, and Engineering <br />Divisions. <br />• Determine any potential phasing opportunities or needs <br />• Prepare preliminary cost estimates <br />• Refine site concepts and develop preferred plan <br />• Final Review (1) <br />• Prepare final schematic design and plans <br />Construction Documentation Scope of Services <br />• Develop a construction document set that meets City of South Bend Board of Public Works <br />requirements that may include, but is not limited to the following: <br />• Existing Conditions Plan <br />• Site Demolition Plan <br />• Site Landscape Plan <br />• Grading and Drainage Plans <br />• Site Details <br />• Erosion Control and Maintenance of Traffic Plans <br />• Prepare final project specifications. <br />• Prepare Review Sets at 30%, 60%, and 90% completion milestones. <br />• Attend a review meeting with the client and project team. <br />• Prepare any revisions. <br />• Update the site construction cost estimate. <br />Bidding and Construction Administration <br />• Attend a pre -bid meeting with the owner and contractor. (1) <br />• Answer contractor questions and assist in preparation of addenda as required. <br />• Attend the Board of Public Works Bid Meeting (1) <br />• Attend a pre -construction meeting with the owner and contractor. <br />• Make up to two (2) site visits to observe construction progress and its accordance with the <br />plans and specifications. <br />• Prepare field reports or provide City with site information for field reports. <br />• Review landscape package progress and prepare any change orders necessary to <br />accommodate updates to landscape design. <br />• Review shop drawings, contractor questions, and change order requests as necessary. <br />• Attend the substantial completion walk through and develop a site work punch list. <br />Graphics and Renderings <br />• Above and beyond the graphics previously identified, we will prepare any site elevation, <br />plan, or perspective renderings for an additional fee for your approval based on our hourly <br />rates. <br />Compensation: <br />Page 12 troyergroup.com I Together, We Will <br />