My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - JPR Corp - McKinley Avenue and Fremont Park Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - JPR Corp - McKinley Avenue and Fremont Park Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:33:18 AM
Creation date
10/10/2018 3:22:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BONE S PETRIE, RAFINSKJ Oq , [Ttn� iwq -At d ikon h i�� t_hiWy N'k,o K, I (JO I, �W'f I <br />September 25, 2018 <br />City of South Bend <br />Division of Engineering <br />1316 County -City Building <br />227 West Jefferson Boulevard <br />South, Bend, Indiana 46601 <br />Attention'. Ms. Sue Ellen Doudrick, P.E. <br />RE: PROFESSIONAL CONSULTING SERVICES FOR MCKINLEY AVENUE AND <br />FREMENT PARK IMPROVEMENTS, SOUTH BEND, INDIANA <br />Dear Sue Ellen, <br />Thank you for contacting Jones Petrie Rafinski (JPR) regarding the above referenced project. We have <br />appreciated being able to be of service to you in, the past and hope to be afforded the opportunity to <br />provide your with our services for this project. <br />UNDERSTANDING OFTHE, ASSIGNMENT <br />The City of South Bend is looking for a consulting firm to assist in the, preparation of Construction <br />Documents for the McKinley Avenue and Fremont Park Improvement projects. It is the desire of the City <br />to have both project be bid out and awarded Iby the end of 2018, <br />The McKinley Avenue project, located between: Tuxedo Drive and 27ffi Street, is to address the existing <br />erosion problems occurring along the north side of the street. The erosion activities have caused the <br />existing roadway edge to collapse and is barricaded. This project is to improve the existing stormwater <br />management by incorporating now concrete curb, drainage structures, bank stabilization and repairing <br />the existing roadway. <br />The Fremont Park project is to incorporate a new concrete curbs and sidewalks to provide better <br />pedestrian and ADA access to the park. The City is looking to construct a sidewalk Wong the east side of <br />Fremont Street from Hamilton Street to Marquette Boulevard and on the north side of Marquette <br />Boulevard from Fremont Street to Olive Street. In addition, the City is interested in providing a signed and <br />painted designated mid -block crossing on Fremont Street to provide pedestrian crossing from, the LaSalle <br />Landing Apartment Community Center to Fremont Park. As part of this project, stormwater management <br />from the streets in the form of curb inlets and possible drywells are to be incorporated into the design. <br />;*901 161:K <br />Task 1 — Tggographic Survey: <br />The scope of services for this task will be to complete the topographic survey for both projects. JPR has <br />completed topographic survey services for the McKinley Avenue project. However, based on recent <br />discussions with the City additional survey work to the west of the project site will be required to <br />determine the existing drainage patterns. <br />Survey work for Fremont Park will include the collection of existing data approximately 15' from the edge <br />of pavement into Fremont Park. <br />p r, "I SOUrce.com (,'0 1 's111 k WEI Y Ilbl3 W GoiA9VtlI b i "',i t <br />4_dt(� 2(: 11)) () � rl� E." "Id 4 ,1, 1 1" oi t ft <br />E I k I t i i 4 4 6 574.232.4388 260.422.2522 <br />574.293.7762 <br />
The URL can be used to link to this page
Your browser does not support the video tag.