My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - VPA Maintenance Storage Building Project No 118-046R - The Robert Henry Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Award Bids
>
Award Bid - VPA Maintenance Storage Building Project No 118-046R - The Robert Henry Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 11:56:44 AM
Creation date
9/11/2018 4:17:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
me We z4":11 il] ZIU11111:11 14 Leally 0 <br />ffim <br />Project Name VPA Maintenance Storage Building <br />Project No. 118-046R <br />For Bids Due August 28, 2018 <br />PART I <br />(Must be completed for all bids. Pllease type or print) <br />Date: Tke- oenkq V CD -Do rrji, ala <br />Bidder (Firm): [Lbea <br />Address: A S . E�&"es <br />City/State/Zip: sl�Akl, & Telephone Number: <br />Agent of Bidder (if Applicable): to [A NO 1 11 <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />the City of South Bend, Indiana, in accordant with plans and jspecifications prepared by: <br />Y%i I <br />and dated c3C) for the sum of (enter the Total Bid as shown on the Proposal) <br />S, <br />(s <br />(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Mmedcal) <br />The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in <br />the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance <br />with the notice. Any addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are <br />shown in the original contract if accepted by the City.ol <br />basis, the itemization of the units shall be showp.,ottia p, <br />-2 <br />1, the cost of units must be the same as that <br />Bend. If the bid is to be awarded on a unit <br />attachment. <br />e. <br />(Printed <br />ACCEPTANCE <br />The above bid is accepted this day of <br />Subject to the following conditions: <br />'k B04RD OF PUBLI WOR, <br />A- 4�6_� <br />Gary A. CAilot, T <br />-Presid <br />t Ut L, P <br />Elizabeth A.Maradik, Member <br />James A. Mueller, Member <br />Version 10/17/2017 Contractor's Bid for Public Works - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.