Laserfiche WebLink
ARTICLE IX <br />FACILITY MAINTENANCE <br />Section 9.01 STRUCTURAL AND SYSTEMS MAINTENANCE. Maintenance of all <br />structural components of the Stadium and all heating, ventilating, air conditioning, plumbing and <br />electrical systems shall be the responsibility of the Park Board. The Park Board shall conduct <br />such routine and preventive maintenance of such systems as is required. <br />Section 9.02 OPERATION OF HEATING AND AIR CONDITIONING SYSTEMS. <br />The operation of the heating and air conditioning systems shall be the responsibility of the Park <br />Board. The Park Board will train appropriate staff of the Team to enable the staff to properly <br />regulate the heating and air conditioning systems for Team Events, Team Special Events, and <br />Park Board Events held in the Stadium. <br />Section 9.03 EXTERIOR SITE MAINTENANCE. While the Team will provide Field <br />and Surrounding Grounds Maintenance as a component of Team Stadium Services, the Park <br />Board shall be responsible for all long -term maintenance of the external grounds of the Stadium. <br />The Park Board's responsibility will include but not be limited to repaving, striping and sealing <br />of the paved areas and capital improvements to and replacement of the landscaped areas which <br />shall include required replacement of trees and shrubs. <br />Section 9.04 LONG -TERM FIELD MAINTENANCE. While the Team shall perform <br />Field and Surrounding Grounds Maintenance as a component of Team Stadium Services, <br />including sod replacement necessitated by the normal wear and tear of the field turf, the Park <br />Board shall be responsible for all major turf replacement and for the artificial Field Turf. Sod <br />removal and /or replacement necessitated by the conversion of the Stadium field for athletic <br />events or resulting from damage to the field occurring at Team Events, Team Special Events, or <br />Park Board Events, shall be handled pursuant to the Stadium Operation and Services Article of <br />this Stadium Agreement. <br />ARTICLE X <br />UTILITIES <br />Section 10.01 WATER AND SEWAGE SERVICE. The Park Board shall be <br />responsible for all water and sewage service required for the operation of the Stadium during the <br />term of this Stadium Agreement. <br />Section 10.02 OTHER UTILITIES. The Team shall be responsible for the payment of all <br />utilities other than those referred to in Section 10.01. <br />Section 10.03 LIGHT BULB REPLACEMENT. The Team will be responsible for all <br />light bulb replacement in the Team Areas and Common Areas of the Stadium during the term of <br />this Stadium Agreement. <br />Section 10.04 REPLACEMENT OF FIELD AND EXTERIOR SITE LIGHTS. The <br />Park Board shall be responsible for the replacement of exterior site lights while the Team shall <br />