My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
State QPA Agreement - Network Solutions Incorporated - Hardware and Services for Charles Black Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
State QPA Agreement - Network Solutions Incorporated - Hardware and Services for Charles Black Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 10:19:41 AM
Creation date
8/30/2018 10:04:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
etworkSolutions <br />FII�E WII(W'J� I � <br />0 Assumption 5 —Access poinit cabling and physical installation will be provided by in-house staff or 3rd party contractor provided by <br />customer <br />implementation <br />Network Solution Inc. views the successful completion of this project as a partnership between themselves and City of South Bend. The <br />following section provides the scope of work each is responsible for throughout different phases of this project. <br />Preparation I Provisioning Responsibilities: <br />Network -Wide <br />• NSI will conduct an internal kickoff meeting to review the purpose of the project, desired! business outcomes, proposed design, <br />statement of work, stakeholders, equipment, team member requirements, and base scheduiing. <br />• NSI will conduct an external kickoff meeting with CoSB to verify the purpose of the project, desired Ibusiness outcomes, proposed <br />design, statement of work, stakeholders, equipment ordered, equipment delivery timelines, and installation dates and timelines. <br />• NSI wili provide a project plan that outlines the expected steps needed to accomplish the installation successfully with minimum <br />interruption. <br />• NSI wil'I create an inventory document detailing the building each installed product belongs to base upon serial number. <br />Wireless <br />• CoSB will provide access to the existing wireless LAN controller for configuration of the new wireless access points <br />• CoSB will provide a list of SSIDs that should be available to users. <br />• NSI will provide a recommended design for the wireless system deployment. Items addressed in this design may include access Ipoint <br />location, SSIDs (up to per deployment), and advanced wireless settings (data rate, bandwidth, and power). (During testing — <br />further power adjustments may be necessary to provide optimum coverage) <br />0 CoSB will approve or modify the recommended design as needed. <br />• CoSB will provide an expected window of time that changes can be made to the network including those identified as disruptive. <br />• NSI will develop a preliminary testing plan that verifies normal operation of the installed networking equipment (i.e. access, points <br />online, radio settings, remote access) <br />• CoSB will provide, a list of critical services that must be functional in order for testing to be considered successful. <br />• NSI will provide the complete testing pllan for CoSB to approve. <br />• CoSB will install and test all new cabling designated for access points prior to their installation. (in -House or 3rd Party Contractor) <br />Implementation Responsibilities: <br />Network -Wide <br />• NSI' will conduct an Installation Review meeting and verify the Project Plan including network design, equipment delivery, <br />installation times, and testing procedures. <br />Wireless <br />• CoSB will install and document the location of each access point by room number, name, and AP MAC address, (in -House or 3rd <br />Party Contractor) <br />• CoSB will provide lift access if required for high AP cabling or Installation (if applicable) <br />• NSI will configure RAP APs and hostnames for each AP based upon their location. <br />0, NSI will configure new outdoor APs to be in the necessary AP groups <br />• NSI will install Merald licensing and configure the Meraki access point for internal access <br />• NSI will reconfigure the switching infrastructure with new VLANs for new wireless SSIDs on the switching infrastructure. Further <br />configuration of switches is outside the scope of this project unless explicitly specified in othier sections of this scope of work. <br />• CoSB will provide DHCP services for any new networks that are created. <br />q� g"'� <br />
The URL can be used to link to this page
Your browser does not support the video tag.