Laserfiche WebLink
DELIVERABLES <br />This project includes the following deliverables. <br />1. Pump Evaluation Memo. Arcadis will review the pump inspection report, discuss any necessary <br />aspects of the inspection report with Power Plant Services Corporation and prepare a brief memo <br />outlining the recommended rebuild approach. <br />2. 90% Detailed Design. This submittal includes documents that communicate the design <br />approach/intent of all disciplines. Specifically, it includes: <br />• List of proposed materials of construction <br />• Design drawings showing required demolitions and layouts <br />• Project specifications: front end, general requirements, and technical specifications <br />• Opinion of probable construction cost <br />• Preliminary construction schedule <br />• Hard copies (four half-size drawings, two project manuals) and one electronic copy (pdf, <br />searchable format) <br />3. Bid Submittal. This submittal includes 100% complete drawings and specifications suitable for <br />bid purposes, opinon of probable construction costs, construction schedule, and design calculations, <br />and has all Client comments incorporated. Hard copies (three full-size drawings, four half-size <br />drawings, and four project manuals) and one electronic copy (pdf, searchable format) will be <br />submitted to the Client. <br />Schedule <br />Arcadis is prepared to begin work immediately upon written authorization to proceed. It is our <br />understanding that the City desires to award this project in 2018. Design and bid services shall be <br />completed in sufficient time for the City to award the project to the selected bidder by mid -December <br />2018. It is anticipated that construction will begin in January 2019. <br />PART 2 — ADDITIONAL SERVICES <br />A2,01 Additional Services Requiring a4iner°'s Written Authorization <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />1. Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other inforination furnished by Owner or others. <br />2. Services resulting fiom significant changes in the scope, extent, or character of the portions <br />of the Project designed or specified by Engineer or its design requirements including, but <br />not limited to, changes in size, complexity, Owner's schedule, character of construction, or <br />method of financing; and revising previously accepted studies, reports, Drawings, <br />Specifications, or Contract Documents when such revisions are required by changes in <br />Page 6 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for 1 JCDC, All rights reserved. <br />