Laserfiche WebLink
(-,RU "IU SH AND Cf i.lil`dli..IDH ARCHITECTS, TS, IN('- A. 60tiARE DEAL" 5iNCE', 1965 <br />Conduct one pre -bid meeting and assist with bidder questions, review bids received, and prepare <br />bid -tabulation and recommendation for contract award. <br />$800 <br />Monitor contractor construction activities, prepare ,periodic site visits reports, review pay applica- <br />tions and requests for modifications. <br />$2,40B <br />We expect some of the proposed modifications may affect life safety and exiting situations within each floor <br />and it is more than likely an IN DHS State Plan Review will be necessary before local building permits can be <br />issued. We believe this process can happen during the bidding phase of the work. <br />Attention will be paid to ADA-compliance, wherever necessary, however ADA-compliance is not the primary <br />focus of this project, Building also pre -dates in IN Energy Code and is not subject to DOE Comcheck energy <br />certification for any of these renovations. <br />No fees are included for developing a furniture, fixture or equipment inventory for the spaces. if that becomes <br />necessary we can provide an additional quote. We will attempt to shown reasonable, generic furniture spacing <br />for schematic planning purposes, and except for the kitchenette cabinetry, no FF&E will be specified as a part <br />of this work. <br />Additional services beyond those listed above will be charged at our office standard rates of $125/hr for Pro- <br />fessional Staff (licensed/registered) and $75/hr for Technical Staff. Any reimbursable expenses for such Items <br />as plan review fees, blueprint shipping, etc, will be charged at cost. <br />With our current workload of design and construction documents for existing projects and clients, we can fore- <br />cast our availability to start the field -measuring and design work on August C, 2018. As we complete mea- <br />surements and documentation per floor, we will then schedule interviews with you and various departments <br />and begin our schematic designs. We would need to have schematic designs completed and accepted no later <br />than Monday September 17, in order to have construction documents ready for prospective Bidders by Friday, <br />November 2, and a bidding period of November 5-27 (subject to coordination with BPW schedule). An award <br />could then be made in December 2018, and work could commence sometime in early 2019 depending upon <br />department schedules and logistics, <br />We carry full insurance for professional liability, workers' compensation and, general business operations and <br />we can provide an Insurance certificate for your records. <br />If you have any questions, please don't hesitate to contact me. We are ready to serve the City of South Bendl <br />Sincerely, <br />14 <br />Brendan Crurnlish, NCARB, CCS, RA, RID, LFt'.D GA <br />President, and IN Licensed Architect 870155 <br />crumllsh and crumhsla archiitects, Inc. <br />has been sending the South Bend construction cwnni"dty <br />w li IAde tarred achirvoinenh sin , 1i96& <br />vuvm.crewonliOisndcraumVish.c,orri <br />Appendices Page 3 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />