Laserfiche WebLink
This is Appendix 2, eo Architect's Proposal for Professional Services dated <br />7/31/2018. <br />City of South Bend <br />32$5 SLIGAR mAPLE COU:RT, 6U]TE 15 <br />6OUTH 5FN0, iNVAldiA 46(o28, <br />PPONE 514-282 2131B& FAX514-2&2-2,554 <br />A OQUARE DEAL.- SINr-E IUP& <br />W W W. 0 R U tl L 16 W A N PC R U H LI 6 H, C 0 M <br />July 31, 2018 <br />Adam Parson, Project Manager 2018 County -City Bldg Remodels <br />Via email to; aparsonsftsouthbend'In.gcv <br />Adam� <br />It is our pleasure to offer this proposal for design work for the remodeling's on the 12 1h, 13' and 14' floors of <br />the County City Building for various City of South Bend Departments. <br />We have read the Project Charter and we have become familiar with the general arrangement of the existing <br />offices, We also understand the project budget Is $150,000 and the anticipated contractor award date is no <br />later than December 2018, <br />In addition to this proposal letter, please find attached a curriculum vitae for Brendan Crumfish, President of <br />Crumilsh & Crumlish Architects, as well as brief history of the firm ands a list of past projects. <br />After reviewing the criteria in the Project Charter we offer this basic fee proposal to perform necessary archi- <br />tectural design services: <br />Perform field verification of and develop As -Found CAD drawings of the three existing floors of the <br />CCB. We wail provide PDFand DWG version of our files of the existing floors. No furnishings will <br />be shown, only a scalable, shell diagram of essentially "walls/windows/doors". No concealed info <br />nor M/E/P1 layouts, <br />$4,000 <br />Meet with, key personnel of each affected department to clarify intentions, and then develop <br />schematic layouts of the proposed projects (either per floor or per department), for review an ac- <br />ceptance. <br />$4,5010 <br />Develop bidding documents and specifications of accepted schematics, for the various projects (ei- <br />ther per ficior or per department). However only limited MEP documentation due to limited MEP <br />knowledge within CCB. <br />$12,600 <br />Prepare a pre -construction cost estimate of proposed work as eventually designed. <br />$1,200 <br />Appendices Page 2 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />