My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-11 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2010-2019
>
2011
>
06-28-11 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 8:38:59 AM
Creation date
8/4/2011 8:38:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br /> Regular Meeting—June 28, 2011 <br /> 6. NEW BUSINESS (CONT.) <br /> C. Airport Economic Development Area <br /> (4) continued... <br /> investment and to allow future access to the <br /> sewer corridor, and also as a means to <br /> provide a safe walking path from Moreau <br /> Court to the entrance of the Blackthorn Golf <br /> Course, this is a very opportune time to <br /> construct an 8' wide multi-use path on the <br /> south side of Nimtz Parkway. Abonmarche, <br /> the designers of the sewer project, have most <br /> of the site information necessary for the <br /> project design and will engineer a trail <br /> through this Phase 1 corridor. Construction <br /> of the walk could be done this fall as part of <br /> the restoration work of the construction path. <br /> The professional service proposal is in the <br /> amount of$38,800 and a detailed <br /> engineering estimate will be created as part <br /> of the project design. Staff requests approval <br /> of Resolution No. 2910. <br /> The project limits for this project are from <br /> Mayflower Road to Moreau Court and all the <br /> way to the entrance to Blackthorn Golf <br /> Course. A Phase II walkway would go west <br /> to Olive Road. Last week, we found out that <br /> the state was going to be doing bridge work <br /> on a Nimtz Parkway Bridge. The city will <br /> incorporate the pedestrian walkway with <br /> construction of the new. <br /> Mr. Downes asked if this proposal had the <br /> support of Blackthorn owners. Mr. Schalliol <br /> responded that we've had conversations with <br /> some of the owners. The ones we've talked <br /> to are supportive of this. We're going to get <br /> the final design drawn up and present it to the <br /> others. <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.