Laserfiche WebLink
South Bend Redevelopment Commission <br /> Regular Meeting—June 28, 2011 <br /> 6. NEW BUSINESS (CONT.) <br /> C. Airport Economic Development Area <br /> (3) continued... <br /> Upon a motion by Mr. Downes, seconded by COMMISSION APPROVED THE PROPOSAL FOR <br /> Mr. Varner and unanimously carried, the PROFESSIONAL DESIGN SERVICES FOR DESIGN <br /> Commission approved the Proposal for AND CONSTRUCTION OVERSIGHT OF THE OLIVER <br /> INDUSTRIAL PARK MEMORIAL AND WALKWAY <br /> Professional Design Services for design and PROJECT. <br /> construction oversight of the Oliver <br /> Industrial Park memorial and Walkway <br /> project. <br /> (4) Resolution No. 2910 authorizing the <br /> execution of an Addendum to the Master <br /> Agency Agreement (Nimtz Parkway <br /> Multi-Use Path, Phase 1 —Engineering). <br /> Mr. Schalliol noted that Resolution No. 2910 <br /> adds the Nimtz Parkway Multi-Use Path— <br /> Engineering Project to the Master Agency <br /> Agreement. The Addendum includes a <br /> professional services proposal from <br /> Abonmarche to complete the design and <br /> engineering plans related to this project. <br /> By way of project history, when Blackthorn <br /> was designed in the 1990's, it was always <br /> intended that a sidewalk would be created <br /> throughout the corporate park as <br /> development occurred. The decision was <br /> made that a sidewalk would be installed in <br /> the park when a critical mass of development <br /> was reached, and it would be the requirement <br /> of each site owner to allow for the <br /> installation of a sidewalk at the appropriate <br /> time. <br /> Over the next several weeks, as part of the <br /> Mayflower sewer construction project, the <br /> city will be disturbing a large section of <br /> right-of-way.. As a way to protect the sewer <br /> 29 <br />