Laserfiche WebLink
REGULAR MEETING <br />JUNE 26, 2018 195 <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed proposals for <br />the above referenced service. Mr. Gilot stated the proposals will be reviewed and scored based <br />on a matrix system, by a team made up of City representatives. He read the name of the <br />following company submitting a proposal: <br />INVO CLEANING SERVICES, LLC <br />4622 S. Burnett Dr. <br />South Bend, IN 46614 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Mueller and carried, the above proposal <br />was referred to the VPA review team for review and recommendation. <br />AWARD BID — LINCOLN WAY WEST AND CHARLES MARTIN SR DRIVE <br />IMPROVEMENTS —PROJECT NO. 117-072A (RWDA TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on June 12, 2018, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Silveus recommended <br />that the Board award the contract to the lowest responsive and responsible bidder Selge <br />Construction Co., Inc., 2833 S. 1 Vh Street, Niles, MI 49120 in the amount of $1,131,012.15. <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD BID — AMERITECH DRIVE PAVEMENT IMPROVEMENTS — PROJECT NO. 117- <br />057A (RWDA TIF) <br />Mr. Roger Nawrot, Engineering, advised the Board that on June 12, 2018, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Nawrot <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Walsh & Kelly, Inc., 24358 SR 23, South Bend, IN 46614 in the amount of $389,000 for the <br />base bid only. Therefore, Ms. Maradik made a motion that the recommendation be accepted and <br />the bid be awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD BID — BERLIN PLACE SITE CONCRETE LANDSCAPE PLANTINGS AND <br />BLDG. 4 ROOF PAVERS — PROJECT NO. 118-057 (RWDA TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on June 12, 2018, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Silveus recommended <br />that the Board award the contract to the lowest responsive and responsible bidder Rieth-Riley <br />Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614 in the amount of $325,000 <br />for Division B only. Divisions A, C, and D were rejected. Therefore, Ms. Maradik made a <br />motion that the recommendation be accepted and the bid be awarded as outlined above, subject <br />to funding through the Development Agreement. Mr. Mueller seconded the motion, which <br />carried. <br />APPROVE REQUEST TO REJECT BIDS — VENUES PARKS AND ARTS MAINTENANCE <br />STORAGE BUILDING (PARK BOND SERIES) <br />In a memo to the Board, Mr. Patrick Sherman, VPA, advised the Board that on June 12, 2018, <br />bids were received and opened for the above referenced project. After reviewing those bids Mr. <br />Sherman recommended that the Board reject all bids due to exceeding the budget for this project. <br />He noted the scope will be adjusted and the project will be rebid. Therefore, Ms. Maradik made a <br />motion that the recommendation be accepted and the bids be rejected as outlined above. Mr. <br />Mueller seconded the motion, which carried. <br />AWARD QUOTATION — 2018 JANITORIAL SUPPLIES (VARIOUS DEPARTMENTS <br />Ms. Toni Laisure, Central Services, advised the Board that on June 12, 2018, quotations were <br />received and opened for the above referenced supplies. After reviewing those quotations, Ms. <br />Laisure recommended that the Board award the contracts to the lowest responsive and <br />responsible bidders in unit prices as follows: <br />a) Kabelin Commercial: Sec 1: Paper Products, Line Items 1 & 2 <br />b) South Bend Chemical: Sec 1: Paper Products, Line Items 3 & 7 <br />c) HP Products: Sec 1: Paper Products, Line Items 4, 5, & 6 <br />d) All American Poly: Sec 2: Poly Trash Bags, Line Items 8, 9, & 11 <br />e) Interboro Packaging: Sec 2: Poly Trash Bags, Line Items 12, 13, & 14 <br />Unipak Corp: Sec 2: Poly Trash Bags, Line Item 10 <br />L'I <br />