My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lochmueller Group Inc - Leeper Park Improvement Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lochmueller Group Inc - Leeper Park Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:43:40 AM
Creation date
6/19/2018 2:18:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.1.5 Field Study <br />Collect the existing physical, environmental, and cultural conditions of the project area <br />through visits and fieldwork, cross referencing base data with existing and historic plans, <br />and the creation of an existing conditions summary memorandum describing physical <br />factors affecting project development. Utilize collected information to develop individual <br />project scopes and opinions of cost. Information reviewed shall include: <br />1. Adjacent use <br />2. Existing motorized and non -motorized transportation patterns <br />3. Existing architectural and urban design features <br />4. Utility infrastructure <br />5. Existing right-of-way <br />6. Historic fabric <br />7. Tree cover and planting areas <br />Task 1.2 Progress Meetings <br />Attend up to six (6) progress meetings with the Owner during the scoping study. Meetings <br />may be used as working sessions and shall include project updates and input. <br />Task 1.3 Concept Refinement <br />Based on completed tasks above and projects identified in the master plan, Engineer shall <br />develop refined project descriptions to include proposed above and below ground <br />infrastructure changes, landscape, signage, furnishings, and probable materials for each <br />project. Each project opportunities and constraints shall be analyzed to inform the team and <br />provide a rationale for the development of concepts and opinion of probable cost. <br />1.3.1 Connectivity <br />Identify potential path connectivity to and from the park and within the park boundary. A <br />path connectivity concept drawing shall be produced. <br />1.3.2 Multipurpose Field <br />Identify elements needed to transform the existing ball foiled into a multipurpose field. <br />1.3.3 Play Area <br />Develop a design concept plan illustrating play area boundaries, potential equipment, and <br />amenities. <br />Page a <br />(Exhibit A — Engineer's Services) <br />MCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EiCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.