Laserfiche WebLink
PART 1— BASIC SERVICES <br />A 1.01 Study and Report Phase <br />A. Engineer shall: <br />TASK 1.0: SCOPING STUDY <br />Task 1.1 Management and Pre -Concept Services <br />1.1.1 Schedule <br />Maintain a project schedule, updated monthly, that illustrates milestones, meetings dates, <br />submissions, and other critical timeline information. <br />1.1.2 Base Map <br />Review and analyze existing aerial photography, G1S data, and other available data to <br />create a preliminary base map. The base map shall be used in the presentation of <br />recommendations. <br />1.1.3 Existing Document Review <br />As part of the overall existing conditions analysis, work with the Owner to collect and <br />review previous project data deemed important to the development of this project. This <br />could include, if available: <br />1. Summaries of public outreach from previous efforts <br />2. Pending and funded plans and projects within the park <br />3. Comprehensive plans and maps <br />4. Zoning ordinances, design standards, and maps <br />5. Transportation and thoroughfare plans <br />6. Utility plans <br />7. Park plans <br />1.1.4 Historic Research <br />Perform basic research of the history of Leeper Park including: <br />1. Historic plans and other documents such as newspaper articles <br />2. Historic photographs <br />3. Leeper Park Cultural District Report, 1998 <br />4. Standards and Criteria for Leeper Park, Historic Preservation Commission <br />Page 3 <br />(Exhibit A -- Engineer's Services) <br />F_JCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National society of Professional Engineers for EJCDC. All rights reserved. <br />