My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Black and Veatch Corp - Services for WWTP Electrical Upgrades
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Black and Veatch Corp - Services for WWTP Electrical Upgrades
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:15:34 AM
Creation date
6/19/2018 2:08:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• DAF Building <br />• Scum Building <br />• Reuse Pump Station <br />• Gallery No. 1 <br />• Gallery No. 2 <br />• Gallery No. 3 <br />• Disinfection Building <br />• Old Reuse Pump Station <br />The existing Power Building MCC will be replaced with a new 480V panelboard resulting in <br />the existing panelboard being fed by a new panelboard. The MCCs and panelboards are <br />expected to be similar in size to existing equipment and not exceed the design load rating of the <br />existing floors. No structural analysis of the existing structures is expected to be necessary. <br />Any structural analysis or modifications that become necessary due to unforeseen <br />circumstances will be considered supplemental services. <br />A Preliminary Drawing List includes; <br />General <br />• Cover Sheet <br />• Index of Drawings, Abbreviations, Legend and General Notes <br />Civil <br />• Civil Symbology, Legends and General Notes <br />• Site Plan <br />• Recommended Construction Sequence <br />• Horizontal Control and Paving Plan <br />• Grading and Drainage Plan <br />• Civil Details <br />• Erosion and Sediment Control Plan <br />• Erosion and Sediment Control Details <br />• Demolition Plan (1 of4) <br />Page 3 <br />{Exhibit A — Engineer's Services} <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for CJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.