My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E(1) Resolution No. 2838
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
01-21-11 Packet
>
6E(1) Resolution No. 2838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 8:26:22 AM
Creation date
1/18/2011 3:32:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�°' ATTACHMENT °C' <br />L FA A SOUTH MAIM S7 OI LAFAYETTE CONNECTOR AND ROUNDABOUT <br />STAFF HOUR JUSTIFICATION • PROJECT DESIGN DEVELOPMENT <br />Work Element <br />)`O <br />STAFF HOURS BY CLASSIITCATiOK <br />Total <br />SL'BCONSCLTANT <br />Shts <br />Prj. 6l.mge, <br />S.-lb <br />C-1 Eng <br />Smiur I <br />Fit— <br />Hours <br />COST' <br />PRELIMINARY DESIGN <br />Survey and Prekminsry Plonin <br />Field Survey <br />4 <br />6 <br />320 <br />l.oafion Route Control Survey and Pint 001 (Bv DIZ) <br />$38,500 <br />Revic. Survey Field Data <br />8 <br />8 <br />Coordination and Control of KV,' Sub - Consultant <br />1 <br />2 <br />2 <br />2 <br />7 <br />Prokmina Plan Submittal <br />Dcsi ner FKid Ins ion <br />4 <br />4 <br />8 <br />Establish Dade Controls. Pr arc 0% -mll Grade Profile <br />4 <br />,6 <br />12 <br />32 <br />D—p Prdtmin &-y Ceotnetn PreWe Ov,.L Pian <br />2 <br />6 <br />24 <br />12 <br />46 <br />lhdvs Coordmation <br />I <br />6 <br />4 <br />q <br />17 <br />Pmpanr Preliminary Title & lndrx Shecis <br />1 <br />_ <br />4 <br />5 <br />Prepare Ptclmmary T ypical Cross Sections <br />1 <br />2 <br />8 <br />fi <br />19 <br />Pmparc Preliminary Plan & Profile Sheets <br />2 <br />8 <br />16 <br />24 <br />SO <br />Roundabout layout and grading Plans <br />4 <br />16 <br />24 <br />4 <br />J8 <br />Prelonun Pight-of-Way Design <br />2 <br />4 <br />8 <br />14 <br />Preliminary Dr a Design <br />2 <br />12 <br />4 <br />1 fi <br />Pre lm inwy Sanitary Sewn Dot gn <br />1 <br />10 <br />4 <br />15 <br />Prelimmary Water Lmc Dcsie <br />2 <br />12 <br />4 <br />18 <br />Prep arc Preirnmary Approach & Dri- DetO <br />2 <br />16 <br />I6 <br />Prep arc Pre Structure Data <br />4 <br />12 <br />16 <br />Prcpm Pmtinm3r> Cross Sections <br />4 <br />24 <br />24 <br />52 <br />Prepare Conceptual Maintenance Of Tmffa <br />2 <br />fi <br />IO <br />Preliminary Commmion Cost Estimate <br />1 <br />2 <br />i <br />8 <br />Environmental Sereenin Report - HazMat ( by ASC Group) <br />— <br />$9,127 <br />Environmental Screening R on - [fist. Arch (bs ASC Group) <br />$6,330 <br />Coordination and Control of Envirorunrnta: Sut.Consuttani <br />1 <br />2 <br />2 <br />2 <br />7 <br />SUBTOTAL HOURS <br />0 <br />17 <br />76 <br />180 <br />464 <br />9 <br />746 <br />S53,9157 <br />RIGHT -OF -WAY DESIGN <br />Disposaion of Prtqmirwy Plan Rcvie , Cortanents <br />1 <br />2 <br />4 <br />7 <br />Field Check Plans <br />Title Sheet and Index Sheet <br />1 <br />4 <br />S <br />Pian & Pmfilc Sheets <br />2 <br />6 <br />24 <br />24 <br />56 <br />Signs <br />10 <br />12 <br />22 <br />Skem Structures <br />12 <br />20 <br />32 <br />S' pals <br />12 <br />6 <br />18 <br />Intersection Details <br />1 <br />2 <br />4 <br />12 <br />19 <br />Roundabout Details <br />2 <br />24 <br />12 <br />24 <br />62 <br />Rel Walls <br />2 <br />4 <br />6 <br />Spec inl L)ramqc Structure <br />1 <br />2 <br />4 <br />7 <br />Smtary Sewn Details <br />2 <br />8 <br />16 <br />L6 <br />Waterline Details <br />1 <br />6 <br />12 <br />20 <br />Mamtenancc of Traffic <br />2 <br />4 <br />F <br />16 <br />J0 <br />Cross Sections <br />2 <br />6 <br />28 <br />42 <br />80 <br />Construction Cost Estimate <br />1 <br />2 <br />4 <br />8 <br />Geoteehnial lnvestiplion (b) Earth Esplorstions, Inc.) <br />57,167 <br />Coordination and Control of Geolechnical Sut>Consuhmt <br />- <br />1 <br />2 <br />6 <br />9 <br />Pavement Design <br />I <br />4 <br />2 <br />7 <br />Utilky Coordination <br />1 <br />8 <br />2 <br />2 <br />13 <br />Hydraulics and Stonn Sewer Cakulations <br />2 <br />6 <br />36 <br />2 <br />46 <br />Pmhrin zr)� Construction Cost Estimate <br />i <br />2 <br />8 <br />1 <br />12 <br />Fxki Check and Documentation <br />4 1 <br />4 <br />2 <br />10 <br />Dispossion of Field Chmk Resdeu Comments <br />1 <br />2 <br />4 <br />8 <br />Is <br />Publk Information Merlin anrion <br />Traffic - Maintenance Plat <br />1 <br />2 <br />4 <br />7 <br />Di :a <br />I <br />4 <br />12 <br />4 <br />21 <br />Public Mm.g <br />3 <br />3 <br />3 <br />9 <br />D' osiion of Public Meal Comments <br />1 <br />2 <br />4 <br />2 <br />9 <br />Legal Descriptions and Transfer Documents (by DLZ Indiana, LLC) <br />594,120 <br />Coordination and Cctarol of "' Sub - Consultant <br />1 <br />2 <br />2 <br />2 <br />7 <br />SUBTOTAL HOURS <br />0 <br />26 <br />78 <br />213 <br />228 <br />18 <br />563 <br />5I01,287 <br />Laason- Fishr, &—taw P.C. <br />Projrcf Pit' No 90 /F 91 <br />Ang,w 20/0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.