inconsistencies discovered in the information, and (2) other information or consulting services that may be
<br />reasonably needed for the Project.
<br />§ 3.2.3 The Architect shall present its preliminary evaluation to the Owner and shall discuss with the Owner
<br />alternative approaches to design and construction of the Project. The Architect shall reach an understanding with the
<br />Owner regarding the requirements, of the Project.
<br />§ 3.2.4 Based on the Project requirements agreed upon with the Owner, the Architect shall prepare and present, for
<br />the Owner's approval, a preliminary design illustrating the scale and relationship of the Project components,
<br />§ 3.2.5 Based on the Owner's approval of the preliminary design, the Architect shall prepare Schematic Design
<br />Documents for the Owner's approval. The Schematic Design Documents shall consist of drawings and other
<br />documents including a site plan, if appropriate, and preliminary building plans, sections and elevations; and may
<br />include some combination of study models, perspective sketches, or digital representations. Preliminary selections
<br />of major building systems and construction materials shall be noted on the drawings or described in writing.
<br />§ 3.2.5.1 The Architect shall consider sustainable design alternatives, such as material choices and building
<br />orientation, together with other considerations based on program and aesthetics, in developing a design that is
<br />consistent with the Owner's program, schedule and budget for the Cost of the Work. The Owner may obtain more
<br />advanced sustainable design services as a Supplemental Service Lander Section 4.1.1,
<br />§ 325,2 The Architect shall consider the value of alternative materials, building systems and equipment, together
<br />with other considerations based on program and aesthetics, in developing a design for the Project that is consistent
<br />with the Owner's program, schedule, and 'budget For the Cost of the Work.
<br />§ 3.2.6 The Architect shall submit to the Owner an estimate of tile Cost of the Work prepared in accordance with
<br />Section 6.3.
<br />§ 3.2.7 The Architect shall submit the Schematic Design Documents to the Owner, and request the Owner's
<br />approval.
<br />§ 3.3 Design Development Phase Services
<br />§ 3.3.11 Based on the Owner's approval of the Schematic Design Documents, and on the Owner's authorization of
<br />any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare
<br />Design Development Documents for the (tuner's approval, The Design Development Documents shall illustrate and
<br />describe the development of the approved Schematic Design Documents and shall consist of drawings and other
<br />documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building
<br />systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and
<br />electrical systems, and other appropriate elements. The Design Development Documents shall also include outline
<br />specifications that 'identify major materials .and systems and establish, in gencral, their quality levels.
<br />§ 3.3.2 The Architect shall update the estimate of the Cost of the Work prepared in accordance with Section 6.3.
<br />§ 3,33 The Architect shall submit the Design Development Documents to the Owner, advise the Owner of any
<br />adjustments to the estimate of the Cost of the Work, and request the Owner's approval.
<br />§ 3.4 Construction Documents Phase Services
<br />§ 3.4.1 Based on the Owner's approval of the Design Development Documents, and on the Owner's authorization of
<br />any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare
<br />Construction Documents for the Owner's approval. The Construction Documents shall illustrate and describe the
<br />further development of the approved Design Development Documents and shall consist of Drawings and
<br />Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other
<br />requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the
<br />Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and
<br />other similar submittals, which the Architect shall review in accordance with Section 3.6A
<br />AAA Document B1011"' — 2017. Copyright @ 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. Ail rigihts reserved. ti!WARNIINGt
<br />Init. This AIAI t':tocurnenat is protected by U.S. Copyright i..aw and internatiionA Treaties. Unammtit uazod reprodusokflu'rmru nuu �tushlbution ofMs AVA`u" Docuuum ent„
<br />or any portion of it, nrmy rem.ulit in severe 601 and c16nniunap pentullUes,, aind wwHI tmP prru.necuted to the n!tnaximuum extent possVe uuonduau the paw This 8
<br />document was produced by AIA software at 12:50:45 on 01/16/2018 under order No. 2731703659 which expires on 01/16/2019, and is not for resale.
<br />User Notes: (369ADA1C)
<br />
|