Laserfiche WebLink
(")8 TIMELINE OVERVIEW <br />Note on Timellne <br />* This timeframe is based on similar projects of similar scale <br />* Reference to p. 9 of the RFP, Create a schedule of the entire process to include realistic tirneframes <br />and including: <br />0 Conceptual/Development phase, Phases 1 6 2 <br />* Design phase, Phase 3 <br />* Engineering phase, Phase 4 <br />C) Fabrication, Phase 4 <br />Quality Control, Phase 5 <br />Delivery, end of Phase 5 <br />0 Training, during Phase 5 <br />T' , x z EX ERIENCES 28 <br />TESqt�LA BUPILT <br />