My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec AF - One or More 2017 or Newer Tandem Axle Dump Truck - Trans Chicago Truck Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Spec AF - One or More 2017 or Newer Tandem Axle Dump Truck - Trans Chicago Truck Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 11:43:03 AM
Creation date
12/13/2017 3:13:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TYPE <br />The intent of the; <br />industry with res <br />product. Bidder <br />complete warran <br />Heavy Duty <br />Dump Body: <br />SHA�� <br />AS <br />DESCRIPTION SPEC Fi ED <br />(Circle One) <br />g?ecificationsfor 14' Dump Bodv <br />specifications is to obtain a dumb body which meets the highest standards of the <br />ct to quality and strength of materials, design and workmanship to the finished <br />UST be an authorized representative of the manufacturer and able to provide <br />service. <br />Note: Body builder must have a pre build conference with time (9/ <br />NO <br />purchaser to go over layout and placement off all equipment <br />and two such sessions during equipment installation. No <br />equipment shall be installed without approved authorization <br />from purchaser. <br />BODY: <br />These specifications shall describe a heavy-duty dutrmp body, Ice and <br />Snow control equipment to be used by the City of South Bend Water <br />Department to maintain the streets. The equipment will consist of <br />Dump Body, underbody scraper, and a load sense central hydraulics <br />system, cable controlled with electronically controlled spreader. All <br />construction shall meet or exceed industries standards. Welding <br />shall comply with current AWS procedures. <br />Alternate to these specifications shall be noted separately at the end <br />of the proposal. <br />NOTE: To insure a proper working body and one that will meet the <br />city's needs, all placements of bed, hitch, lights, etc. shall be <br />approved by the city before installation. Body shall be heavy duty <br />168" in length Inside width shall be 86". <br />Note: there shall not be more than a two inch radius between the <br />- - - - -- , ..� . _ r_s. �■_...�a.-.ate <br />existing leaf boxes` It will be time Maaer's resAUnsiulm Lu jul anc <br />sure body will accommodate leaf box <br />Sides and tailgate constructed of 3/16" Hardox 450 steel. No <br />exceptions to type or grade. Floor constructed of Hardox 450 <br />steel one piece. No exceptions to type or grade. Tailgate shall be 48" <br />in height. <br />Front shall be 3/16" Hardox 450 No exceptions to type or grade. <br />Fonned steel long members shall be '/a" thickness reinforced w / <br />gussets. Understructure shall be crossmemberless. Lower body rub <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.