Laserfiche WebLink
b. The purpose of Engineer's visits to, and representation by the Resident Project <br />Representative, if any, at the Site, will be to enable Engineer to better carry out the <br />duties and responsibilities assigned to and undertaken by Engineer during the <br />Construction Phase, and, in addition, by the exercise of Engineer's efforts as an <br />experienced and qualified design professional, to provide for Owner a greater degree of <br />confidence that the completed Work will conform in general to the Contract Documents <br />and that Contractor has implemented and maintained the integrity of the design concept <br />of the completed Project as a functioning whole as indicated in the Contract Documents. <br />Engineer shall not, during such visits or as a result of such observations of Contractor's <br />Work in progress, supervise, direct, or have control over Contractor's Work, nor shall <br />Engineer have authority over or responsibility for the means, methods, techniques, <br />sequences, or procedures of construction selected or used by Contractor, for security or <br />safety at the Site, for safety precautions and programs incident to Contractor's Work, <br />nor for any failure of Contractor to comply with Laws and Regulations applicable to <br />Contractor's furnishing and performing the Work. Accordingly, Engineer neither <br />guarantees the performance of any Contractor nor assumes responsibility for any <br />Contractor's failure to furnish or perform the Work in accordance with the Contract <br />Documents. <br />8. Defective Work: DELETED <br />9. Clarifications and Interpretations; Field Orders: Issue necessary clarifications and <br />interpretations of the Contract Documents as appropriate to the orderly completion of <br />Contractor's work. Such clarifications and interpretations will be consistent with the intent <br />of and reasonably inferable from the Contract Documents. Subject to any limitations in the <br />Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />10. Change Orders and Work Change Directives: DELETED <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. Engineer shall meet any Contractor's <br />submittal schedule that Engineer has accepted. <br />12. Substitutes and "or -equal": Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13. Inspections and Tests: DELETED <br />14. Disagreements between Owner and Contractor: DELETED <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />