Laserfiche WebLink
B. The Bidding or Negotiating Phase will be considered complete upon commencement of the <br />Construction Phase or upon cessation of negotiations with prospective contractors (except as may <br />be required if Exhibit F is a part of this Agreement). <br />A1.05 Construction Phase <br />A. Upon successful completion of the Bidding and Negotiating Phase, and upon written authorization <br />from Owner, Engineer shall: <br />1. General Administration of Construction Contract: Consult with Owner and act as Owner's <br />representative as provided in the Construction Contract. The extent and limitations of the <br />duties, responsibilities, and authority of Engineer as assigned in the Construction Contract <br />shall not be modified, except as Engineer may otherwise agree in writing. All of Owner's <br />instructions to Contractor will be issued through Engineer, which shall have authority to act <br />on behalf of Owner in dealings with Contractor to the extent provided in this Agreement <br />and the Construction Contract except as otherwise provided in writing. <br />2. Resident Project Representative (RPR): DELETED <br />3, Selecting Independent Testing Laboratory: DELETED <br />4. Pre -Construction Conference: Participate in a Pre -Construction Conference prior to <br />commencement of Work at the Site. <br />5. Schedules: DELETED <br />6. Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for <br />locating the Work which in Engineer's judgment are necessary to enable Contractor to <br />proceed. <br />7. Visits to Site and Observation of Construction: In connection with observations of <br />Contractor's Work while it is in progress: <br />a. Make visits to the Site at intervals appropriate to the various stages of construction, as <br />Engineer Owner deems necessary, to observe as an experienced and qualified design <br />professional the progress of Contractor's executed Work. Such visits and observations <br />by Engineer, and the Resident Project Representative, if any, are not intended to be <br />exhaustive or to extend to every aspect of Contractor's Work in progress or to involve <br />detailed inspections of Contractor's Work in progress beyond the responsibilities <br />specifically assigned to Engineer in this Agreement and the Contract Documents, but <br />rather are to be limited to spot checking, selective sampling, and similar methods of <br />general observation of the Work based on Engineer's exercise of professional judgment, <br />as assisted by the Resident Project Representative, if any. Based on information <br />obtained during such visits and observations, Engineer will determine in general if the <br />Work is proceeding in accordance with the Contract Documents, and Engineer shall <br />keep Owner informed of the progress of the Work. <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />