My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Abonmarche Consultants, Inc. - Ironwood Sidewalks
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Abonmarche Consultants, Inc. - Ironwood Sidewalks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:19:38 AM
Creation date
8/23/2017 1:38:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Furnish 3 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 45 calendar days of authorization to proceed with this phase, <br />and review them with Owner. Within 10 calendar days of receipt, Owner shall submit to <br />Engineer any comments regarding the Preliminary Design Phase documents and any other <br />deliverables. <br />7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner's comments, as appropriate, and furnish to Owner 3 copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within 30 calendar days after receipt of Owner's comments. <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner -directed modifications or changes in the scope, extent, <br />character, or design requirements of or for the Project, and upon written authorization from Owner, <br />Engineer shall: <br />1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />2. Provide technical criteria, written descriptions, and design data for Owner's use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />3. Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />4. Perform or provide the following additional Final Design Phase tasks or deliverables: <br />None <br />5. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. Within 1_0 days of <br />receipt, Owner shall submit to Engineer any comments and, subject to the provisions of <br />Paragraph 6.0l.G, instructions for revisions. <br />6. Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit 3 final copies of the bidding documents, a revised <br />opinion of probable Construction Cost, and any other deliverables to Owner within 21 <br />calendar days after receipt of Owner's comments and instructions. <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.