My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Abonmarche Consultants, Inc. - Ironwood Sidewalks
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Abonmarche Consultants, Inc. - Ironwood Sidewalks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:19:38 AM
Creation date
8/23/2017 1:38:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 12 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated August 8, 201 T <br />Eneineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1— BASIC SERVICES <br />A1.01 Project Scope <br />The proposed project consists of approximately 1,800 lft of sidewalk improvements and <br />extensions along the west side of Ironwood Road from Edison Road to State Road 23. The <br />sidewalk route may be adjusted to avoid utility conflicts and strain poles and will likely require <br />additional right of way be acquired. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, <br />extent, character, or design requirements of the Project desired by Owner, and upon written <br />authorization from Owner, Engineer shall: <br />1. Prepare Preliminary Design Phase documents consisting construction documents at 30% <br />and 70% design and including final design criteria, preliminary drawings, outline <br />specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />• Utility Coordination <br />• RIW Acquisition Services <br />• Neighborhood Meeting <br />Page 1 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.