My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:11:26 PM
Creation date
7/11/2017 2:41:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMERICAN STRUCTUREPOINT, INC. <br />Traffic Signal Modification - Manhour Justification <br />Project: South Bend 2-way Conversion <br />Description: Traffic Signal Modification Design - Sam to and Main 26-May-17 <br />WORK CLASSIFICATION <br />ESTIMATED TIME (HOURS) <br />TOTAL, <br />Project <br />Manager <br />Senior <br />I Engineer <br />Project <br />Engineer <br />Staff <br />Engineer <br />Senior <br />Technician <br />Technician <br />Final Signal Design <br />Signal Modification Tasks (Per Intersection) <br />Identify Available Signal Equipment <br />0 <br />2 <br />0 <br />0 <br />0 <br />0 <br />2 <br />Create Intersection Detail Sheet <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Preliminary Signal Design <br />0 <br />1 <br />2 <br />4 <br />1 <br />0 <br />8 <br />Preliminary Quantities <br />0 <br />1 <br />0 <br />2 <br />0 <br />0 <br />3 <br />Check Utility conflicts <br />0 <br />1 <br />1 <br />0 <br />0 <br />0 <br />2 <br />Final Signal Design <br />1 <br />1 <br />2 <br />00 <br />6 <br />20 <br />Final Plans for Bid <br />1 <br />I <br />2 <br />1:�4 <br />2 <br />4 <br />14 <br />Final Quantities for Signal Items <br />0 <br />1 <br />t <br />2 <br />0 <br />0 <br />4 <br />Hours Per Intersection <br />2 <br />8 <br />8 <br />22 <br />3 <br />10 <br />53 <br /># of Intersections <br />I <br />Signal Modification Tasks Subtotal <br />2 <br />8 <br />8 <br />22 <br />3 <br />10 <br />53 <br />Signal Removal Tasks (Per Intersection) <br />Field Review and Inventory <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Create Intersection Detail Sheet <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Preliminary Signal Design <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Preliminat Quantities <br />0 <br />0 <br />0 <br />D <br />0 <br />0 <br />0 <br />Final Signal Design <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Final Plans for Bid <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Final Quantities for Signal Items <br />1 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Hours Per Intersection <br />0 <br />D <br />0 <br />0 <br />0 <br />0 <br />0 <br /># of Intersections <br />0 <br />Signal Removal Tasks Subtotal <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />General Tasks <br />Title Sheet* <br />Project Layout Sheet* <br />Benchmarks Sheet* <br />Coordinate Service Points <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Specifications <br />0 <br />2 <br />2 <br />0 <br />0 <br />0 <br />4 <br />Contract Book <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Coordination Meetings <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Preliminary Cost Estimate <br />0 <br />0 <br />01 <br />0 <br />0 <br />01 <br />0 <br />Final Cost Estimate <br />0 <br />I <br />1 <br />0 <br />0 <br />0 <br />2 <br />Aries Implelentatian &Field Adjustments for 3 Timing Pla <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />General Tasks Subtotal <br />0 <br />3 <br />3 <br />0 <br />0 <br />0 <br />6 <br />TOTAL. HOURS <br />2 <br />11 <br />11 <br />22 <br />3 <br />t0 <br />59 <br />WEIGHTED HOURLY RATE <br />$165.26 <br />$145.33 <br />$111.36 <br />$78.58 <br />$112.14 <br />$75.64 <br />DIRECT SALARY COST <br />$330.52 <br />$1,598.63 <br />$1,224.96 <br />$1,728.76 <br />$336.42 <br />$756.40 <br />$5,975,69 <br />DIRECT COSTS (See Below) <br />I <br />I <br />I <br />I <br />I <br />1 <br />1 $0.o0 <br />TOTAL FEE (ROUNDED TO NEARST $100) <br />$6,000.00 <br />Unit <br />Cost <br />Quantity <br />Cost <br />Mileage <br />$0.565 <br />0 <br />$0.00 <br />Shipping <br />LSUM <br />0 <br />$0.00 <br />Blueprints <br />$1.50 <br />0 <br />$0.00 <br />Copies <br />1 $0.10 <br />0 <br />$0.00 <br />Mylars <br />1 $3.50 <br />1 <br />0 <br />TOTAL W I $0-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.