Laserfiche WebLink
F. Certified Operator Requirement: <br />1. As required by Section 17-10 (o)(4)(b) of the South Bend Municipal Code: <br />St. Joseph Energy Center <br />New Carlisle IN 46552 <br />(Hereafter "permittee") shall be required to have a Certified Industrial Wastewater Operator of the State of Indiana <br />with the minimum classification listed below, sign all periodic compliance reports, 90 day compliance status <br />reports, all compliance schedule reports, and all corrective actions related to an effluent limitations violation, <br />indicating whether Pretreatment Standards are being met on a consistent basis, and if not whether additional <br />operation and maintenance and/or additional pretreatment is required to meet the Pretreatment Standards and <br />Requirements. <br />Industrial Certified Operator Classification: A -SO <br />2. This permit holder shall have a certified operator, with the minimum classification listed above, sign <br />all periodic compliance reports, 90 day compliance status reports, all compliance schedule reports, <br />and all corrective actions related to an effluent limitations violation. <br />3. If a certified operator is not signing peimittee's user reports, a $500.00 fine will be assessed followed <br />by a $500.00 fine for every user report submitted, until the certified operator requirement is met. <br />G. Significant Change in Discharge / or Production <br />1. The permittee shall notify the Control Authority of any significant changes to the permittee's <br />operations or system which might alter the nature, quality, or volume of its wastewater at least thirty <br />(30) days before the change. <br />2. For permittees subject to categorical production based mass standards, average rates of production <br />shall be reported in the months of July and January. If at any time the permittee becomes aware that <br />the average production rate has changed or will change by twenty (20) percent or more, the permittee <br />shall notify the Control Authority regarding the change. <br />a. Any permittee operating under a permit incorporating equivalent mass or concentration limits <br />calculated from a Production -Based Standard shall notify the Director within two (2) business <br />days after the permittee has a reasonable basis to know that the production level will significantly <br />change within the next calendar month. Any permittee not notifying the Control Authority of <br />such anticipated change will be required to meet the mass or concentration limit in its permit that <br />were based on the original estimate of the long-term average production rate. <br />H. Flow Measurement Devices <br />1. The permittee shall submit a Flow Measurement Plan (FMP) within 90 days of the issuance of this <br />permit. The FMP shall describe, at a minimum, how the permittee will measure and record water <br />and wastewater flow in their facility, including how wastewater discharged to the sewer will be <br />measured. The FMP shall also describe how the flow of any internal processes will be measured <br />when such measurement is required. The IMP shall be subject to review by the Control Authority. <br />