My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - St. Joseph Energy Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Discharge Permit - St. Joseph Energy Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:18:24 PM
Creation date
5/24/2017 1:44:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Additional Sampling <br />1. If the permittee monitors their wastewater discharge for any pollutant more frequently than required <br />by this permit, using test procedures in 40 CFR 136 or amendments thereto or otherwise approved <br />by U.S EPA or as specified in the permit, the results of such monitoring shall be included in any <br />calculations of actual daily maximum or monthly average pollutant discharge, and results shall be <br />reported in the -specific time frame report submitted to the Control Authority. <br />C. Notification of Batch or Infrequent Discharge <br />Within 30 days of the effective date of this permit, the permittee shall commence to notify the City <br />of South Bend via e-mail twenty-four (24) hours in advance of all batch or infrequent discharges to <br />the City's sewer so that during this time compliance monitoring may be conducted. The subject line <br />shall include the words "discharge notification" followed by the outfall number, anticipated time of <br />discharge, and the anticipated volume of discharge. The permittee may request a modification of <br />notification requirements. All requests for modification of notification requirements are subject to <br />approval by the City of South Bend. The notification shall be made via e-mail to <br />Pretreatment2SouthBendlN. Gov. <br />D. Noncompliance Notification and Re -Sampling <br />1. The permittee shall notify the Control Authority immediately of discharges that may cause problems <br />to the POTW, including any slugload or accidental discharge. <br />2. If sampling performed by the permittee indicates a violation, the permittee shall: <br />a. notify the Control Authority orally within twenty-four (24) hours of becoming aware of the <br />violation and; <br />b, submit a written follow up report within five (5) days of becoming aware of the violation and; <br />c. resample and submit the results of that analysis to the Control Authority within thirty (30) days <br />after becoming aware of the violation. <br />3. The permittee shall notify the Control Authority of any other noncompliance with this permit, not <br />described in D(1) and D(2) above, in writing within five (5) days of becoming aware of the <br />noncompliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.