My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - St. Joseph Energy Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Discharge Permit - St. Joseph Energy Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:18:24 PM
Creation date
5/24/2017 1:44:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PART III- REPORTING REQUIREMENTS <br />A. Monitoring Reports <br />Monitoring results obtained shall be summarized and reported on an Industrial User Periodic <br />Compliance Report (PCR), The PCRs are due on the twentieth (20"') dog of the month following the <br />required monitoring time frame. <br />2. The PCR shall indicate the nature and concentration of all pollutants in the effluent for which <br />sampling and analysis were performed during the monitoring time frame preceding the submission <br />of each report, including measured flows. The PCRs shall also include all supporting documentation <br />necessary to demonstrate compliance. <br />3. The PCR shall be signed by a Certified Industrial Wastewater Operator of the State of Indiana <br />indicating whether Pretreatment Standards and Requirements are being met on a consistent basis, <br />and if not whether additional operation and maintenance and/or additional pretreatment is required <br />to meet the Pretreatment Standards and Requirements. <br />a. The Certified Operator shall sign one of the following statements: <br />"Pretreatment Standards and Requirements are being met on a consistent basis." <br />Or <br />"Pretreatment Standards and Requirements are not being met on a consistent basis. Additional <br />operation and maintenance and/or additional pretreatment is required to meet the Pretreatment <br />Standards and Requirements." <br />4. All reports, including but not limited to PCRs, the Flow Measurement Plan, the Slug Control Plan, <br />and corrective actions in response to permit violations, shall include the following certification <br />statement signed by an Authorized Representative. See Part IV (13)(15) of this permit foi <br />requirements concerning the Authorized Representative. <br />"I certify under penalty of law that this document and all attachments were prepared under my direction <br />or supervision in accordance with a system designed to assure that qualified personnel properly gather and <br />evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, <br />or those persons directly responsible for gathering the information, the information submitted is to the best <br />of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties <br />for submitting false information, including the possibility of fine and imprisonment for knowing <br />violations." <br />a. If the designation of an Authorized Representative is no longer accurate because a different <br />individual or position has responsibility for the overall operation of the facility or overall <br />responsibility for environmental matters for the company, a new written authorization must be <br />submitted to the Director prior to or together with any reports to be signed by the Authorized <br />Representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.