My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - New Carlisle and St. Joseph Energy Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Discharge Permit - New Carlisle and St. Joseph Energy Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:17:47 PM
Creation date
5/24/2017 1:41:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FYI ... The Water Treatment Facility's permit includes the following requirements found within the <br />discharge permit. <br />1) The Water Treatment Facility shall report flow daily. <br />2) The Water Treatment Facility's Authorized Representative shall sign all reports including but not limited <br />to Periodic Compliance Reports (PCR), Slug Control Plans, Flow Measurement Plans, and corrective <br />actions in response to permit violations. <br />3) The Water Treatment Facility shall, within 90 days of receipt of this discharge permit, submit a Slug Control <br />Plan and a Flow Measurement Plan. Please see Part III (E) and (H). <br />4) When collecting composite samples, samples must be obtained over a 24 hour period or for the duration of <br />discharge within the 24 hour sampling period including, if applicable, multiple batches. <br />5) Samples shall be obtained through a flow -proportional sampling technique. If the Water Treatment Facility <br />can demonstrate that time -proportional sampling is as representative as flow -proportional sampling, then a <br />time -proportional sample may be collected. If the Water Treatment Facility chooses to demonstrate that <br />time -proportional sampling is accurate they must do so within 120 days of the effective date of this permit <br />or they shall commence flow -proportional sampling at that time. Please see Part lI (B) (1) of your <br />wastewater discharge permit for details. <br />6) The Water Treatment Facility shall have a Certified Operator for the State of Indiana sign all <br />compliance reports including, but not limited to PCR's, Corrective Action responses related to <br />effluent limits violations.... See Part III (F) (1). <br />7) To be submitted with the PCR, the Certified Operator shall sign one of the following statements: <br />"Pretreatment Standards and Requirements are being met on a consistent basis" or "Pretreatment Standards <br />and Requirements are not being met on a consistent basis. Additional operation and/or additional <br />pretreatment is required to meet the Pretreatment Standards and Requirements". Please see PART III (A) <br />(3) (a). <br />8) Only the Authorized Representative shall be required to sign the certification statement found in Part III <br />(A) (4) of this permit. <br />9) Please review Section Part IV (B) (15), which clarifies the requirements concerning the Authorized <br />Representative. <br />10) For all after hours required oral notifications call: 574-277-8515 and dial zero (0) to reach an operator. See <br />Part III (1) of your permit for details. <br />If you have any questions, feel free to contact Manny Bueno at: (574) 235-5798 or <br />mbueno@southbendin.gov or Lauren Trapp at: (574) 235-5852 or ltrapp@southbendin.gov <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.